11198141 4S4P 12.8V 80Ah Lifepo4 Battery Pack

Brand Name:RYDBATT
Certification:CE/ROSH/UL/MSDS/UN38.3/CB, IEC62133
Model Number:12.8V 80Ah
Minimum Order Quantity:Negotiable
Delivery Time:30-45 work days
Payment Terms:D/P, T/T,
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: Building C,Huaming Industrial park,Huaming Road, Dalang, Longhua,Shenzhen,Guangdong,China
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

11198141 4S4P 12.8V 80Ah Lifepo4 Battery Pack

Product specification

No.contentTesting methodRemark
1
Charge cut-off voltage
14.6V
2
Discharge cut-off voltage
8.0V
3Standard charge
Under the condition of the ambient temperature of 25±2℃,Charge the battery at constant current of 0.2C to reach 14.6V. Then charge the battery at constant 14.6V voltage until the charging current decreasing to 0.02C.
4Standard discharge
After the standard charging , rest for 1 hour then
discharge to 8.0V@0.2C.
5Shipments voltage11-12.5Vcapacity ≤30 %
6Maximum Charge Current≤16A
7Maximum continuous
working current
≤100A
8Rated capacityTypical capacity:80Ah
Minimum capacity:79.4Ah-5%
standard
discharge after standard charge
9Operation temperature rangecharging:10~45℃
humudity:60±25%
discharging:-20~60℃
60±25%R.H
10Storage temperature
≤1 month: -20 ~ 45℃
≤3 months: -10 ~ 30℃
≤1 year: 0 ~ 30℃
10~25℃
60±25%R.H
Best 10~25℃ for
long-time storage



About company:

1. Passed ISO9001, ISO14001, certified High-Tech & safety production enterprise;
2. 28 engineers providing technology support on product constructure, PCM, BMS, battery and matching charger solutions etc;
3. Automated high-speed SMT equipments and automated battery pack assembly line to ensure the quality consistancy and big volumn lead time;
4. SAP + MES systems monitoring from raw material to final production;
5. Core strength:
a). multi-point temperature monitoring
b). SOC/SOH/FCC update automatically
c). protocol communication technology
d). cell balancing
e). failure recording
f). 10uA comsumption after shutdown





Delivery Time:

- Material Preparation Time: 7-15 days (or inventory)

- Production & Assembly Time 3-10 days

- Testing & Packaging Time: 2-10 days

- Total Delivery Time: 30-45days

- The faster delivery could be negotiable.

Factory photo:


Contact with our sales team for your OEM and ODM order.

OEM/ODM Service:
If you want to display your own brand logo in products, bags, labels or anywhere. Or you need to develop battery packs according to your product orientation. Our OEM and ODM services are ready to do it.

Packing:
According to Stardard Export Packing.
Carton box, wooden box, wooden pallet


Ryder Electronics established in Shenzhen on July 18, 2005, mainly in the business of battery packs. In 2009 the company passed ISO9001 and improved the product quality standard to fulfill the high-end requirements from our customers.

In 2012, Ryder Electronics moved to a new facility and expend the production capacity, the Productivity improved nearly 10 times than before.

In 2013, Ryder Electronics imported ERP (SAP) system to supervise order execution process.

In 2017, Ryder Electronics expanded the SMT, imported high-speed patch machine from Germany.

Until now the factory grows into a modern enterprise which integrated injection molding, PCB designing, SMT and battery pack assembling services.

In 2018 the company passed ISO14001certification, introduced automated battery production line to further improve the production quality and capacity.
























































China 11198141 4S4P 12.8V 80Ah Lifepo4 Battery Pack supplier

11198141 4S4P 12.8V 80Ah Lifepo4 Battery Pack

Inquiry Cart 0