Fast Loading Pillar Mounted Jib Crane Operation Smoothly Free Maintenance

Brand Name:Silence
Certification:ISO CE
Model Number:BZ
Minimum Order Quantity:1 set
Delivery Time:15 days
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Address: Crane Industrial Park, Changyuan County, Henan Province, China.
Supplier`s last login times: within 17 hours
Product Details Company Profile
Product Details

3 Ton Workshop Widely Used Floor Mounted Jib Crane, Jib Crane Design Calculation


Product presentation


BZD type electric rotary cantilever crane is model CD1 and MD1 electric hoist supporting the use of a crane, the crane by the post, rotating arm rotary drive device and electric hoist, column bottom through the anchor bolt on the concrete foundation, cantilever rotary driven by cycloidal pinwheel reducer, electric hoist on the cantilever beams as a straight line running from left to right, and lifting heavy objects.


Fixed column slewing crane is composed of column device, slewing device, slewing device and chain electric hoist, including upper column, lower column, main beam, main beam tie rod, lifting mechanism (chain electric hoist), rotary mechanism, electrical system, ladder climbing and maintenance platform.


The lower end of the column is fixed on the concrete foundation, and the rotating arm can be rotated according to the user's requirements.The turning part is divided into manual turning and electric turning. The chain hoist is installed on the spiral arm track for lifting heavy objects.


Product superiority


BZ type pillar jib crane has the advantages of unique structure, high safety, reliability, high working efficiency, energy-saving and time saving, flexible operation, etc.


1. Compact Design


The compact structure design makes pillar jib crane light in dead weight and excellent in work performance, improve space utilization rate and narrows hook operation distance to the maximum intently.


The best material handling solution for your applications.


2. Smooth, Fast Loading, excellent performance


Stepless frequency conversion control system is installed to the crane and trolley, which makes pillar jib crane brake stably, locate accurately, perform reliably, and travel steadily, position quickly, and solve the problem of the swing of loads.


3. Safer, Reliable, Using Free Maintenance Design


The best technology is adopted which makes frequent operations safe and efficient.


Perfect braking systems can largely improve pillar jib crane safety and reliability, equipped with dustproof design, the working life can reach up to 1 million times.


Hardened and polished tooth surface ensures the operation of crane smoothly without troubles.


Using maintenance technology


1. Operators shall strictly abide by the operation rules of the crane, and overload is not allowed.


2. Terminal baffle is not allowed to be used as the normal parking method.


3. The chain or steel rope of the heavy object must be strong enough and securely tied.


4. Lifting and moving of heavy objects shall be carried out in the vertical condition.


It is prohibited to drag or forcibly lift heavy objects buried underground with electric hoist.


5. It is strictly forbidden to stand on the top of lifting heavy objects and strictly forbidden to walk on the bottom.


6. Do not hang heavy objects in the air after work or rest.



Technical parameters

ModelBZ0.5BZ1BZ2BZ3BZ5
Lifting capacityT0.51235
Max. Lifting heightM33344
Max. Horizontal throwM2.63-42.9-3.93.83.7
Max. Radius of gyrationM3.64-54-555
Max. Rotation momentT/M36121827
Angle of revolutionDegree360
Lifting speedNormalm/min8(4)
Slowm/min0.8(0.4)
Traveling speedm/min20
Angle of revolution speedm/min10.750.70.90.6

Packaging

China Fast Loading Pillar Mounted Jib Crane Operation Smoothly Free Maintenance supplier

Fast Loading Pillar Mounted Jib Crane Operation Smoothly Free Maintenance

Inquiry Cart 0