Product Description
The oil filter element is responsible for filtering out impurities,
such as dirt, debris, metal particles, and sludge, from the engine
oil. It prevents these contaminants from circulating in the engine,
which can cause premature wear, damage, and reduced engine
performance.
Construction: The oil filter element is typically made of a porous
material, such as cellulose, synthetic fibers, or a combination of
both. It is designed to trap and hold contaminants while allowing
clean oil to pass through.
Filtration Efficiency: The quality and efficiency of the oil filter
element determine its ability to remove contaminants from the oil.
Higher-quality filter elements can capture smaller particles and
provide better filtration performance, helping to maintain cleaner
oil and protect the engine.
Part Name: | Element; Oil Filter | Part number | 8-97148270-0 8971482700 |
Brand Name: | BZLP | Quality: | High quality&low price&long life |
Model Number: | NPR/4HF1 700P | Warranty: | 1 year |
Condition: | 100% new | Delivery: | Within 8 days after receiving the payment |
MOQ: | 5pcs | Place of Origin: | Guangdong, China (Mainland) |
Package: | Neutral Package or as customers’ request | Payment Term: | Western union,T/T |
Advantages
1) 20 years experience for ISUZU auto parts.
2) More than 400 suppliers in different area of China cooperation.
3) No more than 24 hours will feedback to your inquiry with exactly
correct information.
4) Reasonable price and good quality especially.
5)At least 1 year warranty.
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown
cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your
authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the
photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR.
Q4. How about your delivery time?
A: Generally, it will take 45 to 60 days after receiving your
advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We
can build the molds and fixtures.