Add to Cart
GE SEER 1000 MC Holter Recorder TPU 7 Lead Ecg Trunk Cable Snap type AHA
Number of leads
5leads,7leads
Compatible Modle: GE SEER 1000
Features
1:Insulated performance:Between wire and wire ,wire and shield ,the
insulated resistance should >100MΩ ,the testing voltage should
be 100 DC.
2:Strength of anti electricity , between wire and wire ,wire and
shield,exert AC1000V±20%,50Hz voltage,1 s, creepage
current<0.25mA, 1 s, creepage current≤0.25mA
3:Creepage current: use the 120V AC 60HZ power supply, live wire
tadem ammeter and all trunk cable and lead wire signal cable, the
ammeter indicate the passed creepage current less than 10A
4:Anti defibrillation performance(sutible for the product with
defibrillation function) The product suffer DC5000V 360J(joule)20%
power surge 3 times (every time exert electricity power time is
60seconds) Change in resistance value does not exceed ±10%
Our main product show:
CE Certificated
Reusable Spo2 Sensor,Disposable Spo2 Sensor,
Spo2 Extension Cables, ECG Cable with Leadwires,
EKG Cable with Leadiwres, Temperature Probes,
Fetus Transducers, IBP Adaptor Cables,
Reusable NIBP Cuff ,Disposable NIBP Cuff ,
NIBP Connector & Air Hose, Needle and other material are CE Verified.
Our Service
1. We are the factory, Welcome OEM/ODM, the price can be more competitive.
2. Sample order, develop new products
3. We will reply you for your inquiry in 24 hours.
4. After sending, we will track the products for you once every two
days, until you get the products.
When you got the goods, please test them. And we'd like get a feedback from you.
If you have any questions or problem we will offer the solve way for you.
Shipping:
DHL | About 3-5 working days Good at Asia,America,Europe,etc |
FedEx | About 3-7 working days Good at India,America,Europe,etc |
UPS | About 3-6 working days Good at America,Europe,South Africa,etc |
TNT | About 3-8 working days Good at The middle east,Africa |
EMS | About 15-20 days Good at The Russian Federation |
SF express | About 5-10 working days Good at America,Asia,etc |
By Air | About 4-7 working days Most country available |
By Sea | About 7-30 days Only available for coastal areas.Cheapest and longest |
FAQ
Q1. What is your terms of packing?
A: opp bag for each piece + box
Q2. What is your terms of payment?
A: Paypal,T/T, West Union, L/C (over 50000dollars).
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 7 days after receiving your payment. The
specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We
can build the molds and fixtures.
CUstomer need to pay for the sample & Delivery costs.
Q6. Can you develop & design new product?
A: Yes, we have strong ability to develop and design.We are
specialized in this fields.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our
customers benefit ;
2. We respect every customer as our friend and we sincerely do
business and make friends with them,
no matter where they come from.