

Add to Cart
Outlet air case is the main accessory in the outflow air case assembly of drilling mud pump.Madefrom vulcanization of rubber and other materials.In order to reduce the fluctuation of pressureand displacement of drilling mud pump, the air case is usually installed on the discharge pipeline,which can make the mud pump achieve the best inhalation effect. It is widely used in high-pressurepipelines for petroleum and chemical transportation. It can balance the peak pressure ofhigh-pressure fluid of mud pump and stabilize it. Fixed pressure, reduce the role of loss.KB-45Shape size: Φ444.5*235*332,unit weight 9KG;KB-75Shape size: Φ532.5*279.6*378.
Features
1. Pulling strength (Mpa)≥13.
2. Elongation at break (%)≥450.
3. Hardness 60-70.
4.Aging coefficient (120℃X24h)≥0.8.
5. In drilling mud, the volume expansion rate is not more than +-10% after soaking for 24 hours at 70℃.
Mud Pump Parts Model We Can Do
BOMCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | F-1600HL | F-1600L | F-2200HL |
Hong Hua | HHF-500 | HHF-800 | HHF-1300 | HHF-1600 | 3NB-1600F | 5NB-1600 | 5NB-2400 | |
HRSB | RSF-1300 | RSF-1600 | ||||||
RG | RGF-800 | RGF-1000 | RGF-1300 | RGF-1600 | ||||
Lanzhou | 3NB1000C | 3NB1300C | 3NB1600F | 3NB1600L | ||||
EMSCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | FD-1000 | FC-2200 | FB-1300 |
Gardner Denver | PAH | P7 | P8/9 | P10/11 | ||||
National | 7-P-50 | 8-P-80 | 9-P-100 | 10-P-130 | 12-P-160 | 14-P-200 | 14-P-220 | |
Oilwell | A-850-PT | A-1100-PT | A-1400-PT | A-1700-PT | ||||
TSC | WF-500 | WF-800 | WF-1000 | WF-1300 | WF-1600 | WF-2000 | WF-2200 | |
IDECO | T-500 | T-800 | T-1000 | T-1300 | T-1600 | |||
RUSSIA | UNBT-1180L | UNBT-950A | UNB-600 |
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place
order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the
most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we
issue you an PI for your confirmation. You will be requested to do
pr-e paid full payment or deposit before we go into production.
After we get the deposit, we start to process the order. We usually
need 15-25 days if we don't have the items in stock. Before
production has been finished, we will contact you for shipment
details, and the balance payment. After payment has been settled,
we start to prepare the shipment for you.
4) How do you take care when your clients received defective
products?
A: replacement. If there are some defective items, we usually
credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We
check the goods when they go into next step production procedure.
More customer view:90-SOUTHWEST A-1400 PUMP-yindapump.com.pdf