Automotive Cs Carbon Steel Welded Tube / Mechanical Welding Tube Steel

Brand Name:HDT
Certification:ASME, GRADE A, ISO9001,ISO14001, PED
Model Number:Welded Tube
Minimum Order Quantity:5T
Delivery Time:60-75days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Address: Rm. 1202, Buildiing A, Wanda Plaza, Zhangjiagang, Jiangsu, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Stable Performance Automotive Steel Tubes Welded Carbon Steel Mechanical Tubing


1. Scope*

ASTM A787 Q195 SAE1008 DX53 Welded Carbon Steel Mechanical Tubing


Introduction:

NameWelded Carbon Steel Mechanical Tubing
OD28.6-127mm
WT0.8-2.5mm
LengthMax12000mm
Usagemechanical components,automobile, etc
TechnicsWelded
Section shapeRound
MaterialQ195,Q235,Q345,SAE1008,SAE1022,DX53,DX51,DC04,SA1C,etc
Surface treatmentPolished,oiled
PaymentT/T,L/C,Money Gram,Western Union

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.
Product show:

Q&A

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking


China Automotive Cs Carbon Steel Welded Tube / Mechanical Welding Tube Steel supplier

Automotive Cs Carbon Steel Welded Tube / Mechanical Welding Tube Steel

Inquiry Cart 0