5000T Per Heap Leaching Design For Gold
I. Work flow
A. Raw materials preparation (Crushing stage)
Detailed flow process: raw material is transported into coarse by feeder, after crushing, it will be screened. Not-qualified product(big particle) will get into middle crushing stage and then screened by vibrating screen. Finally, qualified product will be transported into storage. Capacity of crushing stage is 400tons per day.
B. Storage area construction
Construct two stock dump of 32*32m, it should be level, and has 3% angle in horizontal and vertical direction. Flatten after laying our clay, and construct drainage ditch and prevent flood into dump.
After storage area is prepared well, lay out high strength polyethylene thin film(film needs to be welded together, prevent leakage, then add 30cm clay on the film, at last, pile up 20cm sand stone and brittle stone(smaller than 20mm).
Construct intercepting gutter, settling pond, barren liquor pond, pregnant liquid pond, pregnant liquid pond and adsorbing column.
C. Heap construction
Qualified crushing product us transported into stock dump by using loader and pile up uniformly to 4m.
D. Maceration and Washing
After construction of storage dump, spray sodium hydroxide of PH 11 on the dump, when PH is close to 10, add cyanide into shower.
E. Pregnant solution goes through adsorption, desorbing and electrolysis, then gets gold mud. After melting, gold mud becomes gold spindle.
F. After heap leaching, ore dump no needs to transport away, which will become permanent waste dump or re-construct after tearing down.

Equipment List

ItemWorking processEquipmentModelQty.

Unit power

/KW

Remark
1Storage binGold tailing bin40m31pcsReinforced concrete
2Pre-screeningGrizzly350*3501setSteel rail & steel rod
3FeedingVibrating feederGZD850*30001set11
4Coarse crushingJaw crusherPE400*6001set30
5ConveyingBelt conveyorB650×28m1set11
6ScreeningCircular vibrating screen2YK15481set15Mesh size 48 & 24mm
7ConveyingBelt conveyorB650×25m1set7.5
8Secondary CrushingFine crusherPEX250*12001set45
9ConveyingConveyingB650×18m1set7.5
10Seepage-proofingPolyethylene filmHDPE film (1mm thickness)2sets5000㎡,Matched with flange, elbow, spray-head, three links, joint and end cap
11SprayingPVC tube and accessories

Ø65×300m(main pipe)
Ø50×200m(main pipe)
Ø32×1500m (branch pipe)

1setsMatched with flange, elbow, spray-head, three links, joint and end cap
12Pregnant liquorPregnant liquor tank10×20×1.52pcsBrick setting and cement sand plaster build by self
13Barren liquorBarren liquor tank10×20×1.52pcsBrick setting and cement sand plaster build by self
14Adsorption pumpSubmersible pump50WQ30-30-7.53sets7.5

Lift: 30m;
Flow rate: 28m3/h;
One set is on standby;

15Spraying pumpSubmersible pump50WQ30-30-7.53sets7.5

Lift: 30m;
Flow rate: 28m3/h;
One set is on standby;

16AdsorbingSeries group of carbon adsorption column¢600×25002sets/4 units in one group;
17Drainage pipesPolyethylene pipeInner dia. 60mm300mConnect spray pumps and adsorption pump, etc
18Agents feedingMixer¢1.5×1.5m1set3Connect spray pumps and adsorption pump.etc
19Desorption & electrolysisDesorption and electro-winning equipment300KG1set36.7To process the gold-loaded carbon;