YN32W00019F1 Excavator Swing Gear Reduction For Kobelco SK200-8

Brand Name:FTB
Certification:ISO9001
Model Number:SK200-8
Minimum Order Quantity:1 Piece
Delivery Time:1 day
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Zhongshan Guangdong China
Address: No.101 Yuewang commercial building East Zhongshan Road Huangpu Area Guanghzou Guangdong China
Supplier`s last login times: within 24 hours
Product Details Company Profile
Product Details

YN32W00019F1 Excavator Swing Gear Reduction For Kobelco SK200-8


Description


The Swing drive reducer gearbox rotates the top of the Excavator on the chassis together with the slewing gear bearing.


Attributes: Heavy Duty Swing Drives are designed to be rebuilt and reused. The below following gear components are included in swing drive: sun gear, planetary gear, needle bearing, roller bearing, carrier, pinion shaft, pinion gear, oil seal, ring gear, swing housing case.


Excavator spare parts nameSwing reducer
Equipment ModelSK200-8 SK210-8
Parts Categoryexcavator swing gear
Spare parts ConditionBrand new
MOQ of order(PCS, SET)1
Parts AvailabilityIn stock
Delivery Lead time1-3 days

Advantage:


1. The gear parts are built to fit to the genuine drive gearbox system.

2. The gear parts are supplied strictly according to the genuine parts catalog.

3. All the gear components are manufactured from carefully selected materials with standard quality using standard production process heat treatment processes — including case carburizing, nitriding, and induction hardening.

4. Surplus stock and the various varioties of gear parts that cover final and swign drive for upto 70 Tons excavator. HITACHI KOMATSU HYUNDAI CAT VOLVO DOOSAN KOBELCO SUMITOMO KATO JCB

FAQ

Q1. Which shipment can you supply?

A: By sea, by air or by express(DHL, Fedex, TNT, EMS, UPS, etc).


Q2. What is your terms of packing?

A: Generally, we pack our goods in neutral cartons or wooden boxes. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.


Q3. What payments are available?

A: T/T , Western Union, Trade assurance, L/C.


Q4. What is your terms of delivery?

A: EXW, FOB, CFR, CIF.


Q5. How about your delivery time?

A: Generally, it will take 1 to 3 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.


Q6. What is your sample policy?

A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample fee and the courier cost.


Q7. Do you test all your goods before delivery?

A: Yes, we have 100% test before delivery.


Q8: How do you make our business long-term and good relationship?

A:1. We keep good quality and competitive price to ensure our customers benefit .

1. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.


Q9: How can i trace my order?

A: We'll send you the Bill of Lading or express tracking number once it comes out.

China YN32W00019F1 Excavator Swing Gear Reduction For Kobelco SK200-8 supplier

YN32W00019F1 Excavator Swing Gear Reduction For Kobelco SK200-8

Inquiry Cart 0