

Add to Cart
Glass fiber air-jet loom, glass fiber air-jet loom, air-jet loom, high-efficiency energy-saving air-jet loom
The technical configuration has the following advantages:
>>Equipped with new electronic control system
>>New rack structure
>>New balance structure of low vibration beating up
>>New main jet extended air pocket structure
>>New double back beam let off structure
>>More efficient weft insertion system
>>Super energy saving solenoid valve and nozzle are used
>>Carrying weaving expert system
Product features:
[excellent high speed performance and low vibration]
High speed performance is one of the most important performance
indexes of air-jet loom.
By designing a more reasonable warp position line and beating up dynamic balance system, the vibration and noise of the loom are greatly reduced, and the ultra-high speed is realized.
The high-level weft insertion system and shedding system matched with super-high-speed, as well as the new frame structure, enable the loom to maintain good weaving performance even at very high speed.
Our Advantages
1. Adopt fixed electromagnet structure, with low energy
consumption;
2. Solid structure ensures stability, and the vertical needle can
bear high load;
3. The electronic jacquard and fabric programming system can double
the work efficiency;
4. Stable transmission, good reliability and low noise;
5. Adopt advanced technology, simple, convenient and easy to
operate;
Our service
1. Factory direct selling
2. Easy to install
3. Durability: 1-year warranty
4. European standards and OEM services
5. Provide instructions
6. Durable, applicable and safe
Our exhibition
Certifications
FAQ
1. Q:What kinds of material you can produce?
A: The dominant material we cast is the main materials we cast are
stainless steel, duplex stainless steel, aluminum, copper and
plastic etc. etc.
2. Q:What is the delivery time of pattern, casting parts and
machining finished parts?
A:In general, pattern making time is 20-40 days base on the design
of the parts, sample making time is 20-30 days, machining finished
parts lead time is 40-60 days. The lead time will vary base one
different design and weight of the parts, please contact us for
details.
3. Q:How is your goods quality?
A:We cooperated with many world class companied for many years, our
products received good response from our customers.
4. Q: Do you have the products in stock?
A: Yes. All products are to be produced according to your order
including samples.
5. Q: What’s the delivery time?
A: It usually takes about 20 working days from order to delivery.
6. Q: Can I mix different models in one package?
A: Yes, different models can be mixed in one package, but the
quantity of each model should not be less than the minimum order
quantity.
7. Q: How does your factory do regarding quality control?
A: Quality is priority. Staff always attach great importance to
quality control from the very beginning to the end of the
production. Every product will be fully assembled and carefully
tested before it's packed for shipment.