Home /Filling Machines /

120BPH 5 Gallon 18.9L Drink Water Mineral Water Filling Machine Bottled Water Filling Production Line

120BPH 5 Gallon 18.9L Drink Water Mineral Water Filling Machine Bottled Water Filling Production Line

Brand Name:FILLPACK
Certification:CE/ISO9001
Model Number:QGF-120
Minimum Order Quantity:1 set
Delivery Time:15 Working Days After Deposit
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Address: H-No15, GuoTai north rd, Yangshe town,Zhangjiagang city,JiangSu province, China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

120BPH 5 Gallon 18.9L Drink Water Mineral Water Filling Machine Bottled Water Filling Production Line


1. The machine is integrated washing filling and capping together.

2. It is ideal machine to produce barrel water. The whole machine is using stainless steel 304 ,rot resistant,can be cleaned easily.

3. Main electric parts are all branded. Air channel system use Air TAC brand product.

4. The machine is with compact construction, will occupy small room, working efficiency is high.

5. Only need 2 operators to control, is a good choice for factory to choose.

The machine set up do not need plug floor screw,after case taking off,set the machine on the flat floor,and then adjust stand height and adjust all stand pressure to be average. After the machine is set up well, get in through water pipe, drain pipe and power,air power.


Parameters:

Model
QGF-120
QGF-200
QGF-300
QGF-450
Filling heads
1
2
2
3
Volume
3-5 gallon
Barrel size
Φ270*490mm
Capacity
120BPH
200BPH
300BPH
400BPH
Air press(Mpa)
0.37
0.37
0.6
0.8
Power supply
1.38KW
2.5KW
5.3KW
5.6KW
Dimension
3400*780*1950mm
3400*780*1950mm
3400*1000*1750mm
5000*2000*1800mm
Weight
400KG
500KG
700KG
1000KG

Detailed Images:


Washing heads
Washing process will be divided into 3 steps:
1, thimerosal washing;
2, clean water washing;
3,pure water washing.
Every washing step is set to 8S,after washing,there will be 10S for dripping.
Filling and capping
Filling value will driven by cylinder to insert into barrel and start to fill, filling time is controlled by PLC, and filling time is adjustable by control panel according to filling liquid surface.
After filling process finish, the filled barrel will be pushed to capping position by barrel stop cylinder, the whole process finish till now.


China 120BPH 5 Gallon 18.9L Drink Water Mineral Water Filling Machine Bottled Water Filling Production Line supplier

120BPH 5 Gallon 18.9L Drink Water Mineral Water Filling Machine Bottled Water Filling Production Line

Inquiry Cart 0