ISO-20653-2006 GBT-2423.37 Auto Parts Test Equipment Dust Blowing Test Chamber

Brand Name:HeJin
Certification:Calibration Certificate(cost additional)
Model Number:AM0016
Minimum Order Quantity:1 set
Delivery Time:40 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou Guangdong China
Address: No.6-36, Yaogu Farm, Shibi No.3 Village, Shibi Street, Panyu District, Guangzhou, Guangdong, China
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

Dust Blowing Test Chamber ISO-20653-2006,GBT-2423.37 Auto Parts Test Equipment


Products Introduction:

This equipment is suitable for the test of electrical electronics, automobiles, motorcycle parts, and seals to prevent sand dust from entering the seals and shells in large dust environments.To test the use, storage and transportation performance of electronic and electrical products, automobiles, motorcycle parts, and seals in the sand and dust environment.The purpose of the test was to determine the possible harmful effects of the particles carried by the air flow on the electrical products.The test can be used to simulate open sand and dust air ambient conditions induced by natural or artificial disturbances such as vehicle motion.Auto Parts Test Equipment


Meet the standards:

GB/T 2423.37-2006 Lc1 or Lc2 test,IEC 60068-2-68 Lc1 or Lc2 test Dust blowing test for IS0 20653:2006, procedure I procedure test for GJB150.12A-2009, procedure I procedure test for MIL-STD-810H 510.7Auto Parts Test Equipment


Design principle:

Design a conical funnel, the bottom of the dust collector, at the dust extraction mouth (right) install high pressure turbine circulation fan inlet, the dust to the inner box at the bottom of the box through the bottom to the left up, before the disposal box, blow into the dust dust from the left to the test box, dust horizontal dust to the right, so as to start to cycle.


Control box and test box are of the overall type:

The bottom of the room body is funnel-shaped, and the dust shaking motor at the bottom will assist in dust recovery

The test box is approximately a cube, whose edge length in the airflow cross section is at least 3 times the maximum of the vertical or horizontal side length of the vertical air flow direction. The test box has the heating function;Auto Parts Test Equipment

The test box has a pretreatment box, and the two boxes have the same air flow section. The air diversion sheet is placed at the back of the entrance of the air flow channel leading to the front box, produce horizontal laminar air flow through the overall arrangement, arrange the blower device producing air flow after the test box, and draw air from the test box and send it to the front treatment box through the air flow channel;

The dust device is of external type and connected by air duct.Auto Parts Test Equipment


Main technical indicators:


modelAM0016-600AM0016-800AM0016-1000

Inner box size W * D * H

(No air duct)

600×600×600mm800×800×800mm1000×1000×1000mm
Outer box size W * D * H3500×1400×1700mm4000×1700×1900mm5000×2000×2000mm
StandardISO-20653-2006,GBT-2423.37 Auto Parts Test Equipment
Fine dust75um below
Thick dust150um below
Sand150um-890um
Airflow rate6m/s, 8.9m/s, (18m/s, 29m/s) blow the sand
Dust concentration in the box and pipe5G/m³,10.6G/m ± 7 (Touch-screen-adjustable)
Arizona dust dosage2-3kg / m (random mismatch customers need their own)
Metal screen sizeNominal line diameter 50um and nominal spacing between lines 75um or below 150um
air blowerFull-plastic centrifugal fan
Sample frame load30kg
Basic structure of dust blowingComposition of pretreatment box, test box, vacuum suction, dust collection box, circulating vacuum blowing device, vacuum system, dust storage tank, flow valve, heating system, reflux blade, sample turntable, protection network, concentration meter dust return pipe, etc.
Dust blowing sand structureLaminar flow, from left to right, blowing sand is from right to left
vacuum systemPressure regulating valve, suction nozzle, pressure regulating three-piece set
Vacuum pump range60~600L/H Auto Parts Test Equipment
Controller control functionDust blowing time (stop, blow) h / m/s is adjustable
Cycle cycle: any adjustable
Power: direct blow
Preset test time: 0s~999h99m99s is adjustable
Control systemPLC and Touch Screen Smart Control System (Teelong brand) or Siemens
sensorThe PT100 test sensor
anemometerHandheld adjustable
lysimeterThe simulated quantity control signal was transmitted to the PLC module for precise control
Internal box materialSUS 304 mirror-faced stainless steel
Outbox materialSUS304 stainless steel
On the doorLarge observation window, special air duct design, to ensure that the box produces a concentration of laminar air flow
heating systemStainless steel mica sheet heating cover
Equipment use conditionsPower supply: AC380 V; frequency: 50HZ; power: 16KW
Ambient conditionTemperature 5℃ to 40℃ relative temperature 85%RH
Safety protection systemLine order protection, electric leakage protection, super-temperature protection, abnormal protection
China ISO-20653-2006 GBT-2423.37 Auto Parts Test Equipment Dust Blowing Test Chamber supplier

ISO-20653-2006 GBT-2423.37 Auto Parts Test Equipment Dust Blowing Test Chamber

Inquiry Cart 0