

Add to Cart
Product description
The turbojet engine installation testing platform is used for
turbojet engine thrust testing; The testing platform mainly
consists of a low resistance slide, an engine mounting bracket, and
a thrust measurement device.
1. Low resistance sliding table:
The sliding platform is divided into a base and a sliding platform,
and a low friction coefficient linear bearing slide rail is
installed between the base and the sliding platform; The base can
directly dock with the tablet; The plane between the base and the
sliding platform is machined to ensure that the flatness of each
plane is not less than 0.02mm.
The linear bearing slide rail installed at the bottom of the
sliding platform ensures relative parallelism during installation,
and the parallelism of the slide rail is ensured to be ≤ 0.02mm
through mechanical processing and positioning.
2. Thrust measurement device:
The thrust measurement device mainly consists of German HBM
high-precision thrust measurement sensors and connectors, with
sensor accuracy not lower than C3 level. The measuring device is
directly connected to the sliding platform in a straight line,
accurately measuring the thrust/tension of the platform as it tends
to move; The platform is equipped with 2 sets of thrust measurement
devices, installed at both ends of the bottom of the platform; One
set is used for measurement, and the other set is used for
calibration measurement.
3. Engine mounting bracket:
The installation bracket is made of high-quality aluminum alloy
processed as a whole, ensuring its overall stiffness and strength;
One end of the bracket is fixed on the sliding platform, and the
other end is connected to the engine. An adapter fixture is
installed on the bracket, and when users replace the engine, they
only need to replace the adapter fixture to meet the docking and
testing needs of different engines.
Exhibition
FAQ
Q: What's the minimum order quantity for our cooperation?
A: We support small trail order of 1 pcs for stock products.
Q:How can I learn more about the products?
A: Please leave your email and we will send you your electronic
sample book.
Q: What's your payment term?
A: Normally 30% T/T deposit, pay in full before shipment.
Q:What's the lead time for my orders?
A: Dynamometers production cycle is 6-8 weeks, sensors production
cycle is 2-3 weeks, other products please contact with us.
Q: How do we get the overall solution of the test bench?
A: Leave us your email, our technical staff will communicate with
you about the detailed plan.
Q: Can I come to visit your factory?
A: Sure, you are always welcome to have a visit.