Add to Cart
Flyash cellular concrete production line with comprehensive technical support from Zhongke
aac block production line
* Light weight.
* Environment- friendly.
* Energy-saving.
* Fire-proof.
aerated concrete (AAC) plants and we can supply complete set of
autoclaved aerated concrete plant with annual capacity from 30000 M3 to 300000 M3 and also the plant design, equipments installation, technical
instruction and personal training, etc. We can also design and
manufacture as per clients’ requirement.
Raw material: Cement, Lime, Sand, Gypsum, Aluminum powder, Water.
Complete production line consist of special equipment and shared equipment:
Special equipment:
(1). Cutting equipment: tilting crane, cutter.
(2).Proportioning equipment: electronic measuring scale, slurry
beating machine, slurry storage tank, slurry mixer.
(3). Pouring and autoclave equipment: aluminum powder mixer,
pouring mixer, mould, side plate, autoclave truck, carrier car.
(4). Conveying equipment: semi-product crane, end product crane.
Shared equipment includes:
(1). Pressure vessel equipment: boiler, autoclave.
(2). Crush equipment: ball miller, crusher.
(3). Transportation equipment: crane, lifting machine, feeder, belt
conveyor, slurry pump, screw conveyor.
(4). Environment protection equipment: dust remover.
Production technology of Autoclaved Aerated Concrete (AAC)
1) Raw materials handling
Fly ash (or sand, rock flour) is transported into the ball mill
through feeder and belt conveyor driven by electromagnetic
vibration. After milled, it is sent to the pulp tanks for storage
with fly ash pump
The lime is carried into the jaw crusher for crushing through
feeder and belt conveyor driven by electromagnetic vibration.,
after crushed, it will hoisted to the lime storage bin with bucket
elevator, and then sent to ball mill through screw conveyor, and
the milled materials will be put into the batch bin through screw
conveyor and bucket elevator. Chemicals are made into a certain
concentration of solution according to a certain proportion after
the artificial measurement, and sent into the storage tanks for
storing
2) Raw material storage and feeding of Autoclaved Aerated Concrete
(AAC)block
Raw materials are transported into the factory in the automobiles,
fly ash (or sand, rock flour) is concentrated in raw material
field, when using, packed and shipped to the hopper .Bagged cement
or bulk cement is stored in cement silo, when using, packed and
shipped to the hopper. Chemicals and aluminium powders are stored
in chemical warehouse and aluminum warehouse, when using,
respectively shipped to production workshop
3) batching, mixing, pouring
The lime, cement is transported to automatic quantitive scale for
cummulative metering in turn by the screw conveyor under the batch
bin. The screw conveyor can add materials uniformly into the
pouring mixer.
Fly ash (or sand, rock flour) and waste pulp are put into measuring
cylinder for measuring, when all kinds of materials are measured,
and the mould already in place, then begin to mix the slurry,
before pouring it should reach process requirements (about 40℃), if
not enough temperature, make the steam heating in measuring tank.
The materials are added into the aluminum suspension 0.5 ~ 1 minute
before pouring.
4) primary curing and cutting
After pouring, the mould is pushed into the curing room for initial
setting with the conveying chain, room temperature 50~70℃, curing
time 1.5-2 hours(According to the geographical advantages, the
process can be avoided).After primary curing, hang the mould frame
and body together on the cutting table placed with kettle floor in
advance by negative pressure sling, pull off the frame, and the
cutting machine makes the crosscutting and lengthcutting of the
body. The frame is hoisted to the mould carriage for artificial
cleaning and oil removing, and then group the mould for the next
pouring. The cut body along with the kettle floor is hoisted to
kettle car and put into two layers with the crown wheel, between
which there are four supports, and several kettles is made up into
1 group.
The waste materials generated from cutting are shipped to the
slurry mixer beside the cutting machine through the screw conveyor,
and made into waste slurry, by adding water, for the use of
matching materials.
5) Autoclaved and finished product
After the body finishes the grouping on the stop line before the
kettle, open the autoclave door, firstly pull out the finished
kettle car with the hoist, and then pull the kettle car to be
autoclaved into the autoclaved kettle for curing with the hoist.
The finished products on the kettle car are hoisted to the
finished-products storage with overhead crane, and then shipped to
finished-products storage yard with the forklift. The empty kettle
car and the kettle floor are hoisted back to the turn-around, after
cleaned, pulled back to the parking yard with the hoist for the
next use.
Company introduction
We Henan Zhongke Engineering & Technology Co., Ltd. is a manufacturer and exporter of building material equipment & mining machinery in China.
Our main products are AAC block production line, cement machinery, active lime production line, jaw crusher, impact crusher, ball mill, rotary kiln, dryer, dust catcher, and etc.
All products are manufactured under ISO9001:2008 certification. We do best quality products, and provide our best service for customer from home and abroad.