18HP Water Well Drilling Rig Machine 22KW For Deep Borehole Engineering GK 200

Brand Name:ShiTan
Certification:ISO
Model Number:GK 200
Minimum Order Quantity:1 SET
Delivery Time:7 DAYS AFTER PREPAID
Payment Terms:T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Village,Jinzhou City,Hebei province,China
Supplier`s last login times: within 2 hours
Product Details Company Profile
Product Details

18 HP GK 200 Portable Water Well Drilling Rig Machine For Deep Borehole Engineering


Product Description


200m Water Well Drilling Rig 6-9M/ Hour Easy Operation Standard Water well drilling rig is also called bore hole drilling rig Gk-200-2 drilling machine is widely used and hydraulic feeding , which has the characteristics of large power, large lifting force (2T) and high transmission torque.


Product Technical Parameter


Drilling depth200m
Max open hole caliber300mm
End hole caliber75mm
Drill rod caliber60mm
Drilling angle90°~75°
Drill weight (without power)975kg
Triangle convert beltB950 x 4 B1700 x 3
The main machine moving distance300mm
PowerDiesel engine 22KW /Electric motor 15kw
Spindle
spindle speed64, 128, 287, 557r/min
Spindle stroke450mm
Hoist
Max.lifting capacity2400kg
Single line lifting speed0.41, 0.82, 1.64m/s
Wire rope caliber13mm
Wire rope length35m
Reel diameter140mm
Hug floodgate caliber260mm
Hug floodgate belt width70mm
Mud pump
TypeHorizontal single-urn twin-action
DisplacementDiesel engine 170L/min Electric motor 150L/min
Maximum pressure3Mpa
Work pressure1.5Mpa
Inlet pipe caliber40mm
Outlet pipe caliber30mm
Triangle convert beltB1728mm
Hydraulic oil pump
TypeCBT-F-314
Triangle convert beltB1100 X 1

Product Advantages


Adopt automatic hydraulic feeding equipment,improve the drilling efficient;Can replace the drilling rod without stop;Centralized handles, easy operation, safe and reliable.;The drilling rig, pump and diesel engine are installed on a common base frame to make sure the compact structure and save space;The weight is light with high detachability ,easy transportation suit for the operate in plains and mountain areas


What aspects should we pay attention to in the drilling process of water well drilling rig?


Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.

1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.


China 18HP Water Well Drilling Rig Machine 22KW  For Deep Borehole Engineering GK 200 supplier

18HP Water Well Drilling Rig Machine 22KW For Deep Borehole Engineering GK 200

Inquiry Cart 0