Xy-1a Portable Borewell Drilling Machine Gold Mining Exploration Oem

Brand Name:JINZHOUSHITAN
Certification:ISO
Model Number:XY-1A
Minimum Order Quantity:1 set
Delivery Time:7-10 days
Payment Terms:T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Village,Jinzhou City,Hebei province,China
Supplier`s last login times: within 2 hours
Product Details Company Profile
Product Details

XY-1A Gold Mining Exploration ,OEM Hydraulic Borewell Machine


XY-1A Hydraulic Borewell Machine Description


XY-1A Drilling Rig Machine was based on XY-1 100m Depth Hydraulic Drilling Rig Machine adding three drilling rig components parts of hydraulic swivel head, mobile oil cylinder and trailer underframe


XY-1A Hydraulic Borewell Machine Parameter


Drill rig technical informationSwivel Head

Drilling depth


Max.150m

Spindle speed


1010,790,470,295,140(r/min)

Hole diameter


Max.150mSpindle stroke450kmm
Drill rod diameter42mmSpindle pull-downMax.15KN
Angle range90-75Spindle lifting capacityMax. 25KN
Oil pumpWater pump
ModelYBC-12/125ModelHorizontal reciprocating single-acting piston pump
Rated pressure12.5MpaWorking pressureMax. 1.25Mpa
Flow speed8ml/r
Rated speed1500r/min
HoistPower(diesel)
Max. lifting capacity15KNModel(diesel engineZS1105
Hoisting drum revolution

121,76,36(r/min)


Rated power12.1KW
Drum diameter140mmRated speed2200r/m
WEIGHTAROUND 600KG
SIZE1620*970*1560mm


XY-1A Hydraulic Borewell Machine Main Features:


1.keeping bracket is installed on the hoist to form a double wheel support structure, can withstand strong blow.

2.Vertical box four couple of bearings positioned to ensure the rotary machine has a sufficient rigid response to gravel layer ,the complex geological conditions.

3.This machine adopts national patent technology taper clutch and is with charactristics of strong transmission torque,easy operation,free maintenance.

4.Using 46x51 active drill rods which is with high rigitidy, strong delivery torque.


XY-1A Hydraulic Borewell Machine Operation Attentions


1.The drill shall be placed stably and firmly, and the tappet shall be adjusted by automatic fine adjustment or plumb hammer to keep it vertical.
2.Before startup, check and confirm that all parts of the drilling rig are firmly connected, the tightness of the transmission belt is appropriate, the oil level in the reduction box meets the regulations, and the drilling depth limit alarm device is effective.
3.Before starting, the control lever shall be placed in the neutral position. After starting, the idle operation test shall be carried out to check that the instruments, temperature, sound, braking and other works normally before operation
4.During operation, when the rotation direction of the drilling rig needs to be changed, it shall be carried out after the drilling rig stops completely.

China Xy-1a Portable Borewell Drilling Machine Gold Mining Exploration Oem supplier

Xy-1a Portable Borewell Drilling Machine Gold Mining Exploration Oem

Inquiry Cart 0