Lightweight Boring 220v Soil Testing Drilling Rig Machine

Brand Name:ShiTan
Certification:ISO9001
Model Number:GK-200
Minimum Order Quantity:Negotiation
Delivery Time:Within 7-12 days
Payment Terms:T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Industrial Zone,Jinzhou City,Hebei province,China
Supplier`s last login times: within 2 hours
Product Details Company Profile
Product Details

Boring Machine Portable Hydraulic Deep Well Bore Machine Water Well Drilling Rig For Sale


GK 200 Soil Testing Drilling Rig Introduction


GK200 Drilling rig with hydraulic feeding is widely utilized and featured in high power and hoisting load(2T),Large torque transmission,etc.The rotating speed of vertical hexagonal spindle varies between 71r/min-825r/min.It is suited for the geotectonic survey,geological core drilling,small hole drillings for grout,blast and water well in railway,water conservancy,bridge,dam foundation and other construction.Diamond drill vit,alloy drill bit and steel roller drill bit are available for drilling according to different geological structures.


GK 200 Drilling Rig Technical Data


GK200 parameter
Drilling depth200m
Drilling caliber200mm
Drill rod caliber50mm
Drilling angle90°~75 °
Drill weight (No include power)510kg
Spindle
Spindle speed64 128 287 557 r/min
Spindle stroke450mm
Hoist
Max.single line hoisting capacity2400kg
Reel lifting speed0.41 0.82 1.64m/s
Tightrope caliber12.5mm
Tightrope cubic measure35mm
Hug floodgate caliber260mm
Hug floodgate belt width70mm
Distance between drill and hole450mm
Mud pump
TypeHorizontal single urn twin action
Displacement170L/mim
Power
Diesel engineS1115 15HP
Electric motorY160M-4 11kw 1440r/min
Maximum pressure3Mpa
Work pressure1.5Mpa
Water inlet caliber40mm
Water to exit caliber30mm
Triangle conveyer beltB1728mm

Precautions during assembly and disassembly of coring rig:


a. During component disassembly, the locating pin shall be removed first and then other disassembly work shall be carried out. During installation, the locating pin shall be installed first after the position is aligned, and then other parts shall be installed.

b. Protect the joint when removing the oil pipeline.

c. The disassembly times of oil pipeline joints shall be minimized to avoid oil leakage.

d. During disassembly and installation, it is forbidden to strike the casting with force. When it is necessary to strike other accessories, wooden blocks or red copper blocks shall be padded

e. Before installation, the parts shall be cleaned with kerosene and coated with sufficient lubricating oil (or grease). The powder metallurgy shaft sleeve shall be carried out according to the provisions in the section of "use and maintenance".

f. Replace damaged or worn parts

g. When installing the diesel engine, pay attention to check the coaxiality of the crankshaft and the worm.


Features of GK200 hydraulic water well drilling rig

* adopts 53*59 hexagon drilling, which has high rigidity and strong delivery torque.
* the drilling rigis equipped with taper clutch, with the charactristics of strong transmission troque, easy operation and free of maintenance.
* for the winch, we use large module planetary gear and add supporting frame, greatly increasing hoisting and braking ability of the winch.
* vertical spindle are fixed by four groups of bearings to ensure that the water well drilling rig is rigid enough for gravel layer and other complex geological conditions.
we are the first one to equip mud pump with the flow 160L/min in China so that it will save cost and also make the machine compct, moblie and light in weight.

China Lightweight Boring 220v Soil Testing Drilling Rig Machine supplier

Lightweight Boring 220v Soil Testing Drilling Rig Machine

Inquiry Cart 0