GK 200 Hole Exploration Geological Core Drilling Machine

Brand Name:JINZHOU SHITAN
Certification:ISO9001
Model Number:GK 200
Minimum Order Quantity:1 set
Delivery Time:7-12 days
Payment Terms:T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Village,Jinzhou City,Hebei province,China
Supplier`s last login times: within 2 hours
Product Details Company Profile
Product Details

Top Quality GK 200 Hole Core Drilling Exploration Geological Machine Hydraulic Borewell Machine


GK 200 Hydraulic Borewell Machine Introduction:


GK-200 mobile drilling machine is widely used and hydraulic feeding , which has the characteristics of large power, large lifting force (2T) and high transmission torque.

GK 200 Hydraulic Borewell Machine Tech Details:


Drilling Rig
Drilling diameter(mm)75,91,110,130,150,300
Drilling depth (m)200,150,100,70,50,30
Drill pipe diameter (mm)42,50
Drilling angle(°)90~75
Equipment size(L * B * H)1730 * 860 * 1360 (mm)
Rig weight (except engine)700
Mobile device
Moving length350mm
Leave distance300mm
Gyrator
Spindle speed (four gear) (r/min)115,230,505,1010
Spindle travel(mm)450
Spindle no-load lifting maximum moving speed(m/s)0.05
Spindle no load drop maximum movement speed(m/s)0.067
Spindle maximum feed pressure(KN)15
Spindle maximum lifting force(KN)25
Spindle maximum output torque(KN• m)1.5
Winch assembly
Winch maximum lifting force (single rope)20
Reel speed (r/min)20,39,85,170
Reel circumferential speed(m/s)0.172,0.345,0.738,1.476
Reel diameter(mm)140
Wire rope diameter(mm)9.3
Wire rope density (m)40
Brake diameter(mm)278
Brake band width (mm)50

GK 200 Hydraulic Borewell Machine Features:


1. With hydraulic automaatic feeding device, elevated drilling efficiency.

2. Large torque and drilling diameter.

3. With a spherial jaw holding mechanism and the rod replacement without breakdwn, high efficiency.

4. Compact structure, small volume, lightweight, high detachability, easy transportation and suitable for the operations in plains or mountain areas.

5. Adoping large drive pipe, double guide rod, increase the stability.


Gk 200 Hydraulic Borewell Machine Delivery Process:


1. 7-10 working days after receiving payment.

2. Cargo pictures provided or inspection available before shipping.

3.Professional cooperated shipping forwarders.

4.Tracking status after shipment.



China GK 200 Hole Exploration Geological Core Drilling Machine supplier

GK 200 Hole Exploration Geological Core Drilling Machine

Inquiry Cart 0