

Add to Cart
Soil Testing Geological XY-1 Borehole Drilling Machine
XY1 Drill Rig Description
Drilling rig is suitable for core engineering survey, engineering geological survey, survey and exploration of solid mineral deposits, geological drilling hole in advance, blasting hole and inspection hole of various concrete structures.With large rotary torque which are better than the other same level drilling machines. The rotaryunit has different rotating speed grades, which can meet the requirements in different layers and different drilling projects.
XY 1 Drill Rig Parameter
XY-1 Core Crawler Drilling Rig | ||
EURO standards | U.S. standards | |
Drilling capacity | 110m | 361feet |
Hole diameter | Φ75-Φ110mm | Φ3-Φ4.3inch |
Max torque | 0.6knm | 443lbf.ft |
Angle range | 90°-75° | 90°-75° |
Spindle max pull force | 25kn | 5620lbf |
Spindle stroke | 450mm | 18inch |
Hoist max lift capacity(single rope) | 10kn | 2248lbf |
Power unit | ||
Electric motor | 7.5kw | 10hp |
Diesel engine | 10.3kw | 14hp |
Rig weight(without power unit) | 500kg | 1102lb |
XY1 Drill Rig Features
1. The drilling machine has large input power, large output torque and strong drilling capacity.
2. With oil pressure feeding mechanism, the upper end of vertical shaft is equipped with hydraulic chuck clamping structure to improve drilling efficiency and reduce labor intensity.
3. The power head hydraulic control is adopted to make the frame open the orifice, and the working efficiency is high.
4, the drill output speed range is wide, high speed model is suitable for hard rock diamond drilling.
5. The rig is compact in structure, small in size, light in weight,
easy to disassemble and carry, and suitable for hill or mountain
work.
How should you find the right drill rig ?
1,What's the depth and diameter do you want to drill ?
Then we can know which item water well drill rig is ok for you .
2,Pls show us your budget .
Then we can know which type water well drilling machine is ok for you.
Why is the water well drilling rig not suitable for use in rainy
days?
After the well is completed, it is necessary to pump water to check
the results. Under normal circumstances, a large draw down pumping
can be done. The stable duration of the water level shall not be
less than eight hours, and the water flow of the dynamic water
level of the well shall be measured at the same time. The well
drilling project shall ensure the smooth drainage of the
construction site, so the rainy season shall be avoided. When
working while excavating, the excavation slope shall be determined
according to the physical and mechanical properties of the soil
layer, generally 1:1.5, and there shall be a certain distance from
the toe of the spoil slope to the upper opening of the excavation.
For large wells with water inflow from the shaft wall, the water
inlet hole and inverted filter layer of the shaft wall must be
arranged according to the design requirements, and the water inlet
hole shall be prevented from being blocked during construction. The
filter material enclosure at the aquifer shall meet the
requirements, the backfill shall have a certain super elevation,
and the frozen soil in the backfill in winter shall not exceed 15%.