Rotary Hydraulic Crawler Drilling Machine Water Pump Soil Test Spt Use

Brand Name:Shitan
Certification:ISO9001
Model Number:30-300
Minimum Order Quantity:1 set
Delivery Time:5-8 work days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Village,Jinzhou City,Hebei province,China
Supplier`s last login times: within 2 hours
Product Details Company Profile
Product Details

Rotary Hydraulic Crawler Drilling Machine Water Pump Soil Test Spt Use


Introduction to Track Chassis


The new crawler chassis is designed to enhance the bearing capacity of gear, box body and shaft , which make the maximum power of the gearbox can output is nearly double the original product.In the steering and braking structure, single axle steering brake replaces the original the double axle gear brake, which greatly reduces the attrition degree of wear parts.Using wet friction brake is more reliable. The hydraulic transmission tower lifting device is safe and convenient to go up and down and easy to move the whole operation.

Also it can be modified according to the customer's reasonable requirements.


Track chassis parameters


Crawler chassis
ItemFigure
Theoretical velocity10km/h
KN10KN
Load4500KG
Upgrade20º
Minus grade20º
Roll angle20º
Ground clearance200mm
Track width300mm
Track gauge1600mm
Clawler bearing length1350mm
Ground pressure≤30Kpa

Precautions for drilling rigs


1. The crawler type water well drilling rig must have special training, strict examination and certain working experience before taking the post with certificate;

2. The crawler type water well driller must master the operation essentials and comprehensive maintenance knowledge of the drilling rig, and have considerable experience and methods of troubleshooting

3. When shipping the drilling rig, safety inspection shall be carried out. All parts of the drilling rig shall be complete, and the cable shall be free of electric leakage, drill pipe, drill tool and other five damage phenomena;

4. The crawler type water well drilling rig shall be firmly loaded, and the turning or ramp shall be slow and fixed with steel wire fixing points;

5. When entering the construction site, the drilling rig tower shall be fixed, the area of the drilling site shall be larger than the drilling rig seat, and there shall be enough safe space around;

6. The drilling shall be carried out in strict accordance with the hole position, orientation, angle and depth, and the driller shall not change it without authorization;

7. When installing the drill pipe, check the drilling rig to ensure that the drill pipe is not blocked, bent and the screw mouth is not worn. Unqualified drill pipes are strictly prohibited;

8. When loading and unloading the drill bit, strictly prevent the pipe tongs from clamping the cemented carbide sheet, flat drill bit and core pipe


What is an exploration?


Exploration drilling is a procedure in which several test holes are drilled for the purpose of evaluating the contents of the ground in a particular area. It is conducted to find out whether or not materials of value are present, and to assess the quality of those materials. There are a number of industries which use exploration drilling in their work, sometimes with their own drilling crews,


China Rotary Hydraulic Crawler Drilling Machine Water Pump Soil Test Spt Use supplier

Rotary Hydraulic Crawler Drilling Machine Water Pump Soil Test Spt Use

Inquiry Cart 0