200 Meters Deep Borehole Water Well Drilling Machine With Fast Speed Large Hole Diameter

Brand Name:ShiTan
Certification:ISO
Model Number:GK 200
Minimum Order Quantity:1 SET
Delivery Time:7 DAYS AFTER PREPAID
Payment Terms:T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Village,Jinzhou City,Hebei province,China
Supplier`s last login times: within 2 hours
Product Details Company Profile
Product Details

200 Meters Deep Borehole Water Well Drilling Machine With Fast Speed Large Hole Diameter


GK 200 Water Well Drilling Rig Machine Description


200m Water Well Drilling Rig 6-9M/ Hour Easy Operation StandardWater well drilling rig is also called bore hole drilling rig ,it can be used in many different field like :Geological comprehensive survey, road and high-rise building foundation exploration, concrete structure holes, river embankments, roadbed grouting and grouting, civil wells


GK 200 Water Well Drilling Rig Machine Technical Parameter


Drilling depth200m
Max open hole caliber300mm
End hole caliber75mm
Drill rod caliber60mm
Drilling angle90°~75°
Drill weight (without power)975kg
Triangle convert beltB950 x 4 B1700 x 3
The main machine moving distance300mm
PowerDiesel engine 22KW /Electric motor 15kw
Spindle
spindle speed64, 128, 287, 557r/min
Spindle stroke450mm
Hoist
Max.lifting capacity2400kg
Single line lifting speed0.41, 0.82, 1.64m/s
Wire rope caliber13mm
Wire rope length35m
Reel diameter140mm
Hug floodgate caliber260mm
Hug floodgate belt width70mm
Mud pump
TypeHorizontal single-urn twin-action
DisplacementDiesel engine 170L/min Electric motor 150L/min
Maximum pressure3Mpa
Work pressure1.5Mpa
Inlet pipe caliber40mm
Outlet pipe caliber30mm
Triangle convert beltB1728mm
Hydraulic oil pump
TypeCBT-F-314
Triangle convert beltB1100 X 1

GK 200 Water Well Drilling Rig Machine Advantages


Adopt automatic hydraulic feeding equipment,improve the drilling efficient;Can replace the drilling rod without stop;Centralized handles, easy operation, safe and reliable.;The drilling rig, pump and diesel engine are installed on a common base frame to make sure the compact structure and save space;The weight is light with high detachability ,easy transportation suit for the operate in plains and mountain areas


What should be paid attention to during the operation of the drilling rig?


a. When engaging the clutch or rotating the working wheel, it must be light, uniform and stable;

b. When changing the speed, engaging the horizontal and vertical axle boxes and changing each transfer handle, the clutch must be placed at the separation position or the work wheel must be stopped;

c. When using the lift, it is forbidden to press down the left and right handlebars at the same time;

d. After the gear oil pump is started, pay attention to the response of the oil pressure gauge and the hole bottom pressure indicator. During the drilling process, when the pressure at the hole bottom needs to be increased or decreased, it shall be adjusted gradually, and sudden increase or decrease is not allowed; When using the oil pressure system to quickly lift the vertical shaft (fast reversing rod), it is only allowed to carry out under the original load to prevent damage to the parts;


China 200 Meters Deep Borehole Water Well Drilling Machine With Fast Speed Large Hole Diameter supplier

200 Meters Deep Borehole Water Well Drilling Machine With Fast Speed Large Hole Diameter

Inquiry Cart 0