400A Plug In Contact For Box Busduct Copper Conductor Link

Brand Name:Kiande
Certification:ISO9001
Model Number:KDT-28-6
Minimum Order Quantity:1000 piece
Delivery Time:60 working days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Suzhou Jiangsu China
Address: NO 123 Suzhou Dadao East Road Suzhou Jiangsu China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Female Busbar Copper Pins for Busduct Plug in Contact Box


ModelCurrentBusbar SizeTypeRemark
KDT-15-50-100A4/5mmCompact busbar plugT Type
KDT-18-5100-200A4/5mmCompact busbar plugT Type
KDT-22-5250-350A4/5mmCompact busbar plugT Type
KDT-30-5400-630A4/5mmCompact busbar plugT Type
KDT-15-60~200A6mmCompact busbar plugT Type
KDT-18-6250-350A6mmCompact busbar plugT Type
KDT-28-6400-630A6mmCompact busbar plugT Type
KDF-1250-125A19 phase distance,
22 phase distance,
26 phase distance above
Air busbar plugF Type
KDF-160125~160AAir busbar plug
KDF-250160-250AAir busbar plug
KDF-630315~630AAir busbar plug


Busbar Trunking System is the is a system of distributing electric power using copper or aluminium busbar with suitable enclosures and good amount of protection to prevent the cables from getting damaged due to foreign bodies. ... The system of cooling is much better than traditional cabling system.


Installation Guideline of Tap Off Unit (Plug-In Type)


There are two types of plug-in tap-off units :


1) Plug-in tap-off units without automatic clamping system .


2) Plug-in tap-off units with automatic clamping system.

Step 1: Open or remove the tap-off unit cover.


Step 2: Install the protection device in the tap-off unit.


Step 3: Remove the IP protection on the outlet of the run component.


Step 4: Prepare the output cable glands and connect the cables to the tap-off unit.


Step 5: Check that the protection device is switched off and carefully inspect the tap-off unit for tools and objects that may have been left inside the tap-off unit.


Step 6: Position the rear of the tap-off unit on the run component.


Step 7: Plug the tap-off unit into the run component.


Step8: Lock the tap-off unit on the run component using the locking handle located inside the tap-off unit


Step9: Secure the tap-off unit on the run component using the fixing mechanism.


Step10: Close the tap-off unit cover. The system and the load are ready to be energized.

China 400A Plug In Contact For Box Busduct Copper Conductor Link supplier

400A Plug In Contact For Box Busduct Copper Conductor Link

Inquiry Cart 0