Home /Laboratory Heating Equipments /

DELLOK Pin Studded Steel Tubes Tubular Heaters Power plant

DELLOK Pin Studded Steel Tubes Tubular Heaters Power plant

Brand Name:Dellok Yonghui
Certification:ISO90001
Model Number:Studded Tube
Minimum Order Quantity:1 piece
Delivery Time:1-3 weeks
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Nanjing Jiangsu China
Address: No.20 Xinghuo Road,Nanjing,Jiangsu,China
Supplier`s last login times: within 25 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

DELLOK Pin Studded Steel Tubes Tubular Heaters Power plant


About Us


Dellok(YONGHUI Radiating Pipe Manufacturing Co.,Ltd) was established in 2002, which is located in Nanjing, China.We joined HARBIN AIR CONDITIONING CO., LTD. in 2022 and became the most professional industry manufacturer in China. After many years of development, the company now has 66 million yuan in fixed assets, more than 200 employees, and 33 technical staffs. We have 4 aluminum processing production lines, with the annual processing capacity of more than 20,000 tons; And we have 5 tube-drawing production lines; 47 fintube production lines, 1 imported production line from American with the brand of McElroy , with the annual production capacity of 12 million meters the above.

Quality is the theme of eternal pursuit of winner.




Studded Tube Product Description:


Steel studded tubes are used instead of finned tubes for heat transfer in the processing industries, generally in furnaces, gas turbines, fired heaters and furnace applictions where the surface is exposed to a very corrosive environment and where very dirty gas streams require frequent or aggressive cleaning.

The steel studs are automatically resistance welded to the tube, producing high quality forge welds. The welding process enables the combination of any grades for studs and tube: carbon, low alloy, stainless steels and high nickel alloys. Alloy steel pipes are stress-relieved after studding, according to the relevant specifications for the class and grade of steel used.


Studded Tube(Stainless Steel Welded Tube) Manufacturing Process:


Studs are fully automatically welded onto the tubes (pipes) by resistance welding.



Studded Tube(Welded Stainless Tube) Advantages:


To increase the surface area of the tube and to protect tube surface from direct exposure to heat /corrosive environment.

Studding reduces the amount of bare pipes used in these processes. Heat transfer surface of one studded pipe is equivalent to surface of 4 to 10 bare pipes.

Use of studded tubes is ideal for processes/applications, where dirty fuels are used in harsh environments.



Studded Tube(Black Welded Pipe) Properties:

Wear proof design

High heat transferring capacity



Studded Tube(Weld Galvanized Pipe) Applications:


Boiler,Super heater, Gas furnace burner, heat exchange equipment ,chemical equipment,heat recovery of the petrochemical industry, in areas of convection ovens, vacuum generators for chemical processing, etc.Boiler stud tube,Super heater stud tube, Gas furnace burner stud tube.



Studded Tube(Fin Tube) Specifications:


Product Specification
Tube OD25~273 (mm)1”~10” (NPS)
Tube Wall Thk3.5~28.6 (mm)0.14”~1.1”
Tube Length≤25,000 (mm)≤82 ft
Stud Thk6~25.4 (mm)0.23”~1”
Stud Height10~35 (mm)0.4”~1.38”
Stud Pitch8~30 (mm)0.3”~1.2”
Stud TypeCylindrical, Elliptical, Lens type
Stud to tube surface angleVertical or Angular
Material Combinations
Stud MaterialC.S. (most common grade: Q235B)
S.S. (most common grade are AISI 304, 316, 409, 410, 321,347)
A.S.
Tube MaterialC.S. (most common grade: A106 Gr.B)
S.S. (most common grade are TP304,316, 321, 347)
A.S. (most common grade are T/P5,9,11,22,91)
Type of ServiceHigh temperature

Product Categories : Studded Tube


FAQ


Q1: Are you trading company or manufacturer?

A: We are manufacture factory and we can accept OEM order. Welcome to visit our factory and check our products.


Q2: Can I have a sample ?

A: Yes, welcome to place sample order to test and check quality. Mixed samples are also OK.


Q3: What is your the lead time for production?

A: Generally Sample needs 1-3 days, mass production needs 15-30 days, also depends on your request.


Q4: What is the warranty for your products?

A :We provide one year warranty for the products.


Q5: What payment terms do you accept?

A :Trade assurance,TT,Western Union.

China DELLOK Pin Studded Steel Tubes Tubular Heaters Power plant supplier

DELLOK Pin Studded Steel Tubes Tubular Heaters Power plant

Inquiry Cart 0