DELLOK Heating Coils Carbon Steel 10FPI 180 Degree Pipe Elbow

Brand Name:DELLOK
Certification:CE. ISO,EN10204. 3.1 Cert.
Model Number:Reliance-1120
Minimum Order Quantity:N/A Contact us for details
Delivery Time:Ex-work within 3~4 weeks on receipt of order.
Payment Terms:L/C, T/T Contact us for details
Contact Now

Add to Cart

Verified Supplier
Location: Nanjing Jiangsu China
Address: No.18 Tianyue Road,Yanzhou,Jiangsu China
Supplier`s last login times: within 25 hours
Product Details Company Profile
Product Details

Heating Coils Carbon Steel 10FPI 180 Degree Pipe Elbow


Name:HIGH Fin Tubes Fining MachineTube Material:Carbon Steel, Stainless Steel, Copper Etc...
Fin Material:Same As Tube MaterialTube OD:12mm ~ 50.8mm
Tube Length:No LimitFin Height:As Per Client's Requirement
Fin Average Thickness:~0.3mmFin Pitch:10FPI Etc...
Process:ExtrusionFin Type:Extruded HIGH Fins
Voltage:415V / 50HZ (as Per Client's Requirement)Brand:RELIANCE
Package:Plywood Box (export Packing)Training:Supplier's Site OPERATION Training

Extrusion HIGH Fin heating coils ,11FPI extruded HIGH fin tube


Manufacturing Process
A smooth core tube is inserted into an aluminum sleeve and then the fins are extruded out of the aluminum sleeve.

Fins Type:
Solid fins & Serrated fins

Accessories
Tube Support Box, Clamp or Spacer Box(Materials: Aluminum, Zinc or Stainless Steel).

Applications:
The common application fileds are:

  1. Heat exchangers units for power plant(electric, nuclear, thermal and geothermal power plants);

  2. High corrosive systems (condensers, evaporators, sea water desalinations, fertilizing, urea systems, ammonia, gas, corrosive acids);

  3. The petroleum, chemical and petrochemical industries;

  4. The food processing and refrigeration industries;

  5. Natural gas treatment;

Specifications:
Extruded Bimetallic Finned Tube is combined with two different materials.

Items

General Materials

Popular ASTM Materials

Core Tube Material

Any metallic materials, as carbon steel, low-alloy steel, stainless steel, brass, copper, cooper-nickel alloys, aluminum bronze, nickel alloys etc.
(Core tube with extremely thin wall materials can be applied.)

1. Carbon Steel: A179, A192,SA210 Gr A1/C,A106 Gr B
2. Stainless Steel: TP304/304L,TP316/TP316L/316Ti,
A789 S31803/S2205 etc...
3. Copper:UNS12200/UNS14200/UNS70600,
CuNi70/30,CuNi 90/10
4. Titanium: B338 Gr 2

Fins Material

1. Aluminum
2. Copper.

1. Aluminum(Alu.1100,Alu.1060,Alu.6063)
2. Copper.


All dimensions are in Inches and specification upon your requests.

Tube OD

Fin Height

Fin Thickness

Fins per Pitch(Density)

5/8

3/8,1/2

.015/.016/ .020

4, 5, 6, 7, 8, 9, 10, 11, 12

3/4

3/8,1/2,5/8

.015/.016/ .020

4, 5, 6, 7, 8, 9, 10, 11, 12

1

3/8,1/2,5/8

.015/.016/ .020

4, 5, 6, 7, 8, 9, 10, 11

1 1/4

3/8,1/2,5/8

.015/.016/ .020

4, 5, 6, 7, 8, 9, 10,

1 1/2

3/8,1/2,5/8

.015/.016/ .020

4, 5, 6, 7, 8, 9, 10, 11

1 3/4

3/8,1/2,5/8

.015/.016/ .020

4, 5, 6, 7, 8, 9, 10

2

3/8,1/2,5/8

.015/.016/ .020

4, 5, 6, 7, 8, 9, 10

Please email us for more information.


Competitive Advantage:

1. We have more than 10,000 square meters workshop, including 10 finning machines, daily extrusion capacity up to 3,000 meters.

2. The finning machines of Integral Low Fin Tubes are designed and assembled by ourselves and we can offer you finning machines and all accessories etc...

3. The Integral Low Fins are rolled out of the tube surface to increase the tubes external surface area, without affecting any others dimension.

4. Low Fins are very useful for tight condensers and exhibits high efficiency of heat transfer.

5. Economical solutions of heat exchange problems of media with different heat conduction abilities or different current condition

6. High chemical-, thermal- and mechanical resistance, suitable for rough operation conditions.

Our Service:
1. Inquiry-Professional quotation, or send inquiry item more details, we start contact more details
2. Confirm the price, lead time, payment term etc
3. Our sales send the Proforma Invoice with our seal, or you order online to us
4. Customer make the payment for deposit and send us Bank receipt
5. Initial Production Stage-Inform the clients that we have got the payment, and will make the samples according to your request, send you photos or samples to get your approval. After approval, we inform that we will arrange the production & inform the estimated time
6. Middle Production-send photos to show the production line which you can see you products. Confirm the estimated delivery time again.
7. End Production-Mass production products photos and samples will send to you for approval. You can also arrange the third party inspection
8. Clients make payment for balance and ship goods, inform the tracking number and check the status for clients
9. Order can be say "finish" when you receive the goods and satisfy with them
10. Feedback to our about Quality, Service, Market Feedback & Suggestion. And we can do better


China DELLOK Heating Coils Carbon Steel 10FPI 180 Degree Pipe Elbow supplier

DELLOK Heating Coils Carbon Steel 10FPI 180 Degree Pipe Elbow

Inquiry Cart 0