Choke Manifold Working Pressure psi (mpa) 3000(21) Working Temperature ºC (°F) P.U -29~121 (-20~250)

Minimum Order Quantity:1
Delivery Time:10-15 WORK DAYS
Payment Terms:L/C,T/T
Place of Origin:CHINA
Supply Ability:10 PIECES PER MONTH
Packaging Details:WOODEN BOX
Contact Now

Add to Cart

Verified Supplier
Address: 15th/F,Unit1,BLDG#2,Xi'an West OE Park,77 Keji Er Road, Hi-tech Zone, Xi’an, China 710075
Supplier`s last login times: within 26 hours
Product Details Company Profile
Product Details

Choke Manifold Working Pressure psi (mpa) 3000(21) Working Temperature ºC (°F) P.U -29~121 (-20~250)


Descriptions of Choke Manifold Working Pressure psi (mpa) 3000(21) Working Temperature ºC (°F) P.U -29~121 (-20~250):


Choke manifold is necessary device to control the well kick successfully and execute the pressure control technology on oil/gas well in the course of drilling, as it is, the device is adopted to execute new drilling-well's technique of balance pressure, which can avoid pollution of oil-layer, improve the speed of drilling and control blowout effectively. One end of the device connects with the side flange of BOP spool. When BOP closes, it can control the finite pressure from casing by adjusting the choke valve's opening, so balanced drilling can work under minimum pressure-difference.

The choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges and other components.


Specifications:


ModelJG-35JG-35JG-70JG-105
Main path and Side path in(mm)3 1/8×2 1/16(80×52) 4 1/16×2 9/16(103×65) 4 1/16×3 1/16(103×78)
Working Pressure psi (mpa)3000(21)3000(21)
5000(35)10000(70)
Working Temperature ºC (°F)P.U -29~121 (-20~250)
Working mediumMud Gas(sulfur-hydrogen)
Material gradeDD-FF


China Choke Manifold Working Pressure psi (mpa) 3000(21) Working Temperature ºC (°F) P.U -29~121 (-20~250) supplier

Choke Manifold Working Pressure psi (mpa) 3000(21) Working Temperature ºC (°F) P.U -29~121 (-20~250)

Inquiry Cart 0