

Add to Cart
Rubber Leftovers Recycling Line / Small Capacity Rubber Scraps Recycling Line SWP-600
Recycling production line of rubber scraps, rubber scraps, and rubber waste etc.
Equipment composition:
Rough Crusher → Conveying Device (magnetic separation can be added according to customer requirements) → Fine Rubber Powder Pulverizer → Collector → Circulate Vibrating Screen
Application:
It is suitable for any rubber company.
At present, the scraps of rubber companies are sold as waste products, and there is no energy or awareness to recycle.
In some developed countries, the government requires that the company's waste products are recycled by other companies and require high fees.
The production line is to produce the required rubber particles from the leftovers produced in the vulcanization workshop after rough crushing and fine grinding. The rubber particles can be reused according to the mesh size and participate in the production of rubber products again.
Packaging
Equipment painting completed before delivery, and then wrapped with
stretch film, avoid rubbing the paint off the surface, wooden
packaging can be customized, key parts, such as electronic control
box, will be wrapped by shockproof packaging materials, and then
packed in wooden cases.
Our Services
1. Our engineers can design target machines for customers and send
them the drawing to confirm. We are always on the side of saving
your cost.
In the process of production, we will take photos and send to
customers for their track the progress.
2. Documents such as packing list, commercial invoice, and bill of
lading etc. will be sent after the delivery.
3. We could supply free English foundation DWG, installation
drawing, user guide, maintenance manual and part drawing.
4. We supply overseas engineer service and help to train your
workers to operate the machine.
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific
requirement.
From engineer designing to production completion, it needs about 25
to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very
beginning to the end of production.
Every machine will be fully assembled and carefully tested before
shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand
components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas?
How long time will it take?
Yes, we can supply overseas service and technical support but
customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed
and confirmed in the order.
The core of our company culture is innovation, quality, integrity
and efficiency. Also we have had much good cooperation with world
famous rubber production manufacturers. If you come to our factory,
we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name
of airport is Qingdao Liuting airport.
We will pick up you at the airport.