Home /Woodworking Machinery /

OEM Refining Ore Ball Mill Magnetic Iron Processing Plant 17t/H

OEM Refining Ore Ball Mill Magnetic Iron Processing Plant 17t/H

Brand Name:Hengyang
Certification:ISO9001
Model Number:HY-143
Minimum Order Quantity:1
Delivery Time:20-40 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Zhengzhou Henan China
Address: 500m West, Cross road of Rizhao and Industrial Road, Mazhai Industrial Zone, Zhengzhou City, China
Supplier`s last login times: within 39 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Iron Ore Grinding Ball MIll for Iron Magnetic Processing Plant


The most commonly used crushers and grinding mills in iron ore crushing and grinding process for iron ore mining are jaw crusher, cone crusher, hammer crusher and ball mill, ultrafine grinding mill, etc. In iron ore mining, miner usually choose a complete iron ore crushing plant for metallurgy. At present, the most popular iron ore production line consists of two jaw crushers. After beening crushed, the material will be transported for the magnetic separation, and then into the ball mill for grinding.


Iron Ore Processing Plant

Almost all of the iron ore that is mined is used for making steel. So we need the extraction of a pure metal from its ore. The extract the metal from ores, several physical and chemical methods are used. The method used depending upon chemical properties and nature of the ore from which it is to be extracted. It involves four main steps:

1. Crushing and grinding of the ore.

2. Concentration or dressing of the ore.

3. Reduction to free metal.

4. Purification or refining of the metal.


Ball Mill is Mainly for grinding iron ore into powder and use in other steps, so Zhengzhou hengyang Industry recommend you various ball mill:

Sepc.

(Dia. x L)

Rotating Speed
(r/min)

Inlet grain size

(mm)

Capacity

(t/h)

Grinder load
(t)

Main motor


Main reducer


Weight
(t)
TypePower(kw)Rotating speed(r.p.m)TypeSpeed ratio
φ2.2×1120.91≤2515~1750TR1512-8570740Zd805.692
φ2.4×820.91≤2514~1839.5~42TRQ1512-8570740Zd80-9576.4
φ2.4×920.91≤2523~25closed50TR1512-8570740Zd80-9591
φ2.4×1020.91≤2516~2250TR1512-8570740Zd80-95111
φ2.4×1121≤25Open19~24
closed 22~28
62-65YR710-8/1180710740JDX6305.6125
φ2.4×1221≤25Open18~20
closed 21~23
63-65YR800-8/1180800740MBY7106.3127
φ2.4×1321≤25Open21~22
closed 24~26
66-68YR800-8/1180800740MBY7106.3131
φ2.6×1020.6≤2521~2464YR800-8/1180800740JDX7106.3140
φ2.6×1320.6≤2528~3181YR1000-8/11801000740JDX8006.3158
φ3.0×919.13≤2540~4585YR1000-8/11801000740MBY8007.1148
φ3×1118.92≤2544~4795YR1250-8/14301250740JDX9007.1177
φ3×1218.92≤2548~52103YR1250-8/14301250740JDX9007.1182
φ3×1318.92≤2539~45116maxYR1400-8/14301400740JDX9007.1200.7
φ3.2×1118.3≤2545~48112maxYR1600-8/14301400740JDX9007.15213.6
φ3.2×1318.7≤2550~55133maxYR1600-8/14301600740JDX10007.15237
φ3.4×1118≤2545~55120maxYR1600-8/14301600740JDX1000230
φ3.5×1317≤2560~65156maxYR2000-8/17302000740TS130-A-F1257.6
φ3.8×13
(main bearing)
17≤2565~70190YR2500-8/17302500740JS130-C-F1316
φ3.8×13
(slide shoe edge-driving)
17≤2565~70185YR2500-8/17302500740DMG22/2500313
φ4×1316.3≤2578~80191YRKK900-802800745JS140-A348
φ4.2×11
(main bearing)
15.8≤25100~110182~190YR2800-8/178302800740JS140-A-F1D350
φ4.2×13
((main bearing))
15.2≤25110~120230YRKK1000-83350740MFY355-A375
φ4.2×13
(main bearing)
15.2≤25120~130245YRKK1000-83350740MFY355-A390
φ4.2×13
(central driving)
15.2≤25110~120230YRKK1000-83350740MFY355-A380
φ4.6×1415≤25100~115285YR1000-84200740J3160-C485
China OEM Refining Ore Ball Mill Magnetic Iron Processing Plant 17t/H supplier

OEM Refining Ore Ball Mill Magnetic Iron Processing Plant 17t/H

Inquiry Cart 0