

Add to Cart
Customized Prefabricated Steel Structure Building Factory Workshop Warehouse Steel Building
1)All Steel structure Frame parts with prefabricated.
(hole,weld,surface treatment etc)
2)All the Roof and Wall Panels already cut to size for your size
structure.
3)Completely window and door with hinge,handle etc hardware
4)Bolts, Screws and pop-rivets needed to secure your structure.
5)flashing and Silicone to further help insulate your structure.
6)Other Accessories you have choose: gutter,water spout,ventilation
fitting,stairs etc
7)Other internal simple equipment:LED light,shelf racks etc
Items | Specification |
Length | Single slope , double slope , muti slope |
Width | Single span , double-span , Multi-span |
Height | single floor , double floors |
Column | Q235 , Q345 welded H section steel |
Beam | Q235 , Q345 welded H section steel |
Purlin | Q235 C channel or Z channel |
Knee brace | Q235 angle steel |
Vertical and traversal support | Q235 angle steel , round bar or steel pipe |
Tie bar | Q235 steel pipe |
Brace | Q235 round bar |
Cladding system | EPS , PU , Fiber glass wool sandwich panels or corrugated steel sheet with fiber glass wool insulation . available in Different colors & gauge |
Partition wall | sandwich panels ( EPS , PU , Fiber glass wool etc . ) available in Different colors & gauges |
Door | sandwich panel sliding door or roller door |
Gutter | stainless steel or color steel sheet |
Rainspout | PVC |
Live load on roof | In 120kg / Sqm ( Color steel panel surrounded ) |
Wind resistance grade | 12 grades |
Earthquake-resistance | 8 - 9 grades |
Structure usage | Up to 50 years |
Finishing options | vast array of colors and textures available |
Paint Options | Gray paint , red paint , white paint , epoxy zinc etc . Or Galvanized |
Steel Structure Process:
1. Prepare raw materials: Cut steel plate or use internation size H
section steel and angle steel, round tube, round steel, square tube
etc.;
2. Assembly and welding: Our welders will follow the drawings to
assemble the steel members and weld them together as a entire
beam/column/brace and so on; (Our quality inspector will check the
steel pieces after finish welding, this is the first quality check)
3. Sand blast: After finish welding and polishing, our sand blast
effect can reach internation 2.5 high grade, very good for resist
rust; (Secondary quality check)
4. Paint: Within 2 hours after sand blast, all the steel members
should be paint. Client can choose any color and any brand of
paint. (The third quality check)
5. Inspect the goods by client: After we finish a part of
fabrication work, we will invite clients to check the goods before
we pack the steel frame.
6. Packing and loading: If clients require us to load the goods by
close containers, we will pack the steel structure members one by
one on the steel skid and tie the whole steel package well. (The
fourth quality check )
high quality steel structure warehouse building with CE certificate
from Gnee
Prefabricated Steel Structure building for Steel Warehouse with CE
Certificate
steel structure, steel structure building, steel structure
warehouse, light steel structure, high quality steel structure,
large span steel structure, high rise steel structurePrefab steel
structure warehouse industry,China steel structure warehouse for
sale,design steel structure warehouse. hangar,
galvanized steel structure,portal frame steel structure,steel
structure qingdao,prefabricated steel structure warehouse,high
quality steel structure hangar,design steel structure
workshop,qingdao steel structure,hangar prices,prefabricated
warehouse steel
structure,prefabricated steel structure building,steel structure
warehouse price,steel structure prefabricated,prefabricated steel
structure,steel structure shed design,light steel frame structure,