Mining Ball Mill Grinding Machine for Mineral Grinding

Brand Name:Y&X
Certification:Quality Management System Cerification
Model Number:Cement Grinding Mill
Minimum Order Quantity:1
Delivery Time:30 days
Payment Terms:T/T
Contact Now

Add to Cart

Active Member
Supplier`s last login times: within 39 hours
Product Details Company Profile
Product Details

Mining Ball Mill Grinding Machine for Mineral Grinding

Introduction
Ball mill is a critical device for smashing after the materials are crushed. Ball mills are widely used in manufacturing industries of cement, silicate products, new construction materials, fireproofing materials, chemical industry, ore dressing of ferrous and non-ferrous metals and glass ceramics, etc for grounding of various ores and other grindable materials. Generally, overflow ball mills are suitable for high grinding fineness while grid ball mills are suitable for low grinding fineness. (Unfavorable impacts of over grinding on grading can be avoided)

Main Features:

1) This Ball mill machine changes the intrinsic grinding mill structure.
2) Its body and ground plank are an integral whole. So when fixing, it can be lowered on a plane surface once only.
3) Use double tiered roller axletree with centripetal spherical surface as the support of the host axletree can reduce energy cost by 30%.
4) The intrinsic grille pattern forcing evacuation is instead by over fall pattern controlling one. This can improve the milling of the granule and the quantity dealt with is reduced by 15-20%.


Parameter

Specifications
(Diameter x Length)
Rotating
speed
Feed particle
size
Production capability

Grinding body

Loading
capacity

Main motorMain reduction gearWeight
Raw materialsCementModelsPowerRotating
speed
ModelsGear ratio
mr/minmmtkwr.p.mt
Ф1.87 × 723.9<259.57.520.55JR138-8245735ZD60-84.536.8
Ф 2.2×721.4<2513-1510-1220.5JR158-8380735ZD705.053.4
Ф 2.2×1121.6<2522-2550JR1512-8570740ZD805.685.4
Ф 2.2×1121.6<=2515-1750JR1512-8570740ZD805.692
Ф2.2×1321.6<2533-3760YR630-8/1180800740ZD1105.695.1
Ф 2.4×720.91<2022-2614-16.537JR1510-8475740ZD805.670
Ф2.4×820.91<2025-2814-1839.5-42JRQJ1512-8570740ZD805.8576.4
Ф 2.4×1020.91<=25Open: 25-28, close: 38-4016-2250JR1512-8570740ZD805.8592.4
Ф 2.4×1121 ±0.2<=25Open: 41-42, close: 46-4819-24 22-2862-65YR710-8/1180710740ZD1105.6125
Ф 2.4×1221 ±0.2<=25

Open: 40-42,

Close: 45-48

18-2025-2763-65YR800-8/1180800740ZD1105.6102.4
Ф 2.4×1321.5<=2548-5121 - 3068-72YR800-8/1180800740ZD1105.6130.36
Ф 2.6×820.5<=1040-4554YR800-8/1180630740ZD805.6135
Ф2.6×1020.6<=25Open: 21-24, close: 25-2868YR800-8/1180800740ZD1105.6140
Ф 2.6×1020.6<=2533-3568YR560-8800740ZD1104.5136.4
Ф 2.6×1320.6<=2528-3181YR1000-8/11801000740ZD1104.5177
Ф 3.0×919.13Close: 40-4585YR1000-8/1180800740ZD1104.5165
Ф 3.0×1118.92<=2542-48100YR1250-8/1430800740ZD1105177
Ф 3.09×919.13<=25Close: 50-5576YR1000-8/11801000740ZD1105145.7
Ф 3.0×1218.8<=25Close: 42-50100YR1250-8/14301250740MBY8005264
Ф 3.0×1319<=2539-45116YR 1400-8/14301400742MBY900(hard)5200.7
Ф 3.2×7+1.818.25<=2050-5359YR630-81000740ZD1105130
Ф 3.2×1118.1<=2545-48112YR630-81400742MBY900(hard)5.6189
Ф 3.2×1218.3<=547-59120YR 1600-6/14301600992MBY10005.6210
Ф 3.2×1318.3<=550-5525YR 1600-6/14301600992MBY10005.6238
Ф 3.5×1017.3<=2575-8087YR 1250-8/14301250743JS110-A-F15.6197
Ф 3.5×1217<=25Close: 55-60150YR2000-8/17302000740JS130-A-F1233.6
Ф 3.5×1317<=25Close: 60-65156YR2000-8/17302000740JS130-A-F1243.6
Ф 3.8×1316.6<=2560-63185YR2500-8/17302500740JS130-C-F1270
Ф 4.2×1116.6<=25110182YR800-82800740JS130-A252
Ф 4.6×8.5+3.515<=25150150YR800-82800740JS130-A312

Why choose our company machine?


Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.

Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.

Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.

Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.

China Mining Ball Mill Grinding Machine for Mineral Grinding supplier

Mining Ball Mill Grinding Machine for Mineral Grinding

Inquiry Cart 0