

Add to Cart
Introduction
The impeller of agitation tank is driven by the motor and motor
v-belt or gear motor, making the solid particles to suspend and
making agent and ore pulp mixed adequately.
The mixing bucket is driven by the motor through the belt and the
impeller shaft to rotate the impeller to work. The pulp and
flotation agent circulate in the tank under the centrifugal force
and lift force generated by the impeller, so that the agent is
evenly distributed in the pulp.
Features
Its structural features: the impellers at the upper and lower layers are in steel plate encapsulation and connected by bolts; fine balance, easy to be changed and long service life; the spindle is divided into the upper and lower layers, which are connected by locating flange, reducing the sling height; air inflation is dispersed in various points with good gas mixing performance.
Main Applications
It is suitable for slurry (solid particle size < 1.0mm, specific
gravity < 4.7, concentration < 70% (mass ratio)), strong
mixing, no settlement, low energy consumption and long service life
of mixing impeller. It is widely used for slurry preparation in
concentrators, hydrometallurgical plants and some light chemical
industries.
Parameter
Specifications | Effective area | Diameter of impeller | Revolution of impeller | Driving motor | Weight | |
Models | Power | |||||
m³ | mm | r/min | kw | kg | ||
CK1000*1000 | 0.58 | 240 | 530 | Y132M1-6 | 4 | 603 |
CK1250*1250 | 1.4 | 240 | 350 | Y132M2-6 | 5.5 | 1218 |
CK1500*1500 | 2.2 | 420 | 320 | Y160M-6 | 7.5 | 2428 |
CK2000*2000 | 5.46 | 560 | 240 | Y180L-8 | 11 | 3420 |
CK2500*2500 | 11.2 | 560 | 232 | Y225M-8 | 22 | 4332 |
CK3000*3000 | 19.1 | 700 | 220 | Y250M-8 | 30 | 6952 |
CK4000*4000 | 45 | 1000 | 153 | Y280S-8 | 37 | 10516 |
CK5000*5000 | 78.5 | 1250 | 120 | Y280M-8 | 45 | 12620 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine.
Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your
company provide spare parts?
Answer: The warranty period of our machine is one year. For those
wearing parts, we guarantee to provide high-quality parts for a
long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance
payment. Small machine is guaranteed to be delivered within one
month. Large-scale machine is guaranteed to be delivered within 2-3
months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation,
commissioning and operation guidance.