

Add to Cart
Gold Pulp Mixing Equipment Agent Agitation Tank For Gold Processing Plant
Introduction
The impeller of agitation tank is driven by the motor and motor
v-belt or gear motor, making the solid particles to suspend and
making agent and ore pulp mixed adequately. It has four functions:
ore puls.p agitation, agitation storage tank, improving agitation
and agent agitation. Agitation tank is suitable for ore dressing
industry and can also be used in agitation of pulps from other
industrie
Feature
It is suitable for various metal mines, mainly used for stirring
before flotation, so that the reagent and the slurry are fully
mixed, and it can also be used for stirring other non-metallic
minerals.
Parameter
Models and specifications | Dimensions of cell | Effective volume | Impeller | Motor models | Overall dimensions (L x W x H) | Weight | |||
Diameter | Height | Diameter | Rotating speed | Models | Power | ||||
mm | mm | m³ | mm | r/min | kw | mm | kg | ||
RJW-1000 | 1000 | 1000 | 0.7 | 250 | 535/458 | Y90S-4/Y90S-4 | 1.1/1.1 | 1162×1250×1678 | 489 |
RJW-1250 | 1250 | 1250 | 1.4 | 312.5 | 428/367 | Y90L4/Y90S-4 | 1.5/1.1 | 1459×1350×1930 | 607 |
RJW-1500 | 1500 | 1500 | 2.8 | 400 | 334/286 | Y112M-6/Y100L-6 | 2.2/1.5 | 1812×1730×2425 | 1076 |
RJW-2000 | 2000 | 2000 | 5.6 | 500 | 267/229 | Y132M1-6/Y112M6 | 4/2.2 | 2244×2200×2978 | 2051 |
RJW-2500 | 2500 | 2500 | 11.2 | 625 | 214/183 | Y160M-6/Y132M1-6 | 7.5/4 | 2914×2600×3576 | 3029 |
RJW-3000 | 3000 | 3000 | 22 | 788 | 170/145 | Y180L-8/Y160L-8 | 11/7.5 | 3608×3300×4240 | 4010 |
RJW-3500 | 3500 | 3500 | 31.5 | 888 | 151/129 | Y200L-8/Y180L-8 | 15/11 | 4030×3780×4770 | 6540 |
RJW-4000 | 4000 | 4000 | 45 | 1000 | 134/115 | Y225S-8/Y200L-8 | 18.5/15 | 4490×4190×5219 | 8083 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine.
Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your
company provide spare parts?
Answer: The warranty period of our machine is one year. For those
wearing parts, we guarantee to provide high-quality parts for a
long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance
payment. Small machine is guaranteed to be delivered within one
month. Large-scale machine is guaranteed to be delivered within 2-3
months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation,
commissioning and operation guidance.