

Add to Cart
Linear Vibrator Screen / Vibrating Screen Equipment for Metallurgy
Introduction
Amplitude of vibrating screen is adjusted by vibration exciter of
eccentric shaft and eccentric block. It has long screening line of
materials and various screening specifications, featuring reliable
structure, strong exciting force, high screening efficiency, being
sturdy and durable, convenient maintenance and safe operation, etc.
It is mainly applied in material screening in mines, construction
materials, thermoelectricity, chemical industry and other
industries. As for the structure of screen mesh, there are woven
screen mesh, rubber sieve plate and perforated sieve plate
available.
Feature
1.high efficiency, low energy consumption;
2.simple structure, convenient maintenance;
3.fully closed structure without dust pollution;
4.Stable working station and smooth operation;
5.High utilization rate of screen, large unit area, not easy to block, but easy replacement of screen.
6.High-precision screening reach to 96% or above, large processing capacity, etc.
Parameter
Models | Screening area (m2) | Amplitude (mm) | Motor Models | Motor power (kw) | Rotating speed (r.p.m) |
DZS0410 | 0.4×1.0 | 2~4 | YZS3-6 | 0.25 | 970 |
DZS0412 | 0.4×1.2 | ||||
DZS0415 | 0.4×1.5 | ||||
DZS0612 | 0.6×1.2 | ||||
DZS0718 | 0.7×1.8 | YZO-10-6 | 0.75 | 960 | |
DZS0816 | 0.8×1.6 | ||||
DZS0918 | 0.9×1.8 | ||||
DZS1018 | 1.0×1.8 | YZO-16-6 | 1.1 | 950 | |
DZS1020 | 1.0×2.0 | 3~5 | YZO-20-6 | 2 | |
DZS1225 | 1.25×1.25 | ||||
DZS1530 | 1.5×3.0 | ZDS41-6 | 3 | 940 | |
DZS21530 | 1.5×3.0 | 950 | |||
DZS1536 | 1.5×3.6 | 940 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine.
Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your
company provide spare parts?
Answer: The warranty period of our machine is one year. For those
wearing parts, we guarantee to provide high-quality parts for a
long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance
payment. Small machine is guaranteed to be delivered within one
month. Large-scale machine is guaranteed to be delivered within 2-3
months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation,
commissioning and operation guidance.