

Add to Cart
Mining Thickening Equipment Lamella Thickener for Gold Dresssing Plant
Application
Clarification of turbid water in water supply and drainage, sewage
treatment, waste water reuse
Feature
1.The inclined tube has a large effective sedimentation area and
the settling time of solid particles is short covering small
sedimentation distance. With efficient concentration and
classification, its handling capacity per unit is large, generally
4-10 times larger than the average. It takes less space, about 1/3
of the ordinary thickener or 80% of the high efficiency inclined
plate thickener. The outlet can discharge compulsively the high
concentration ore pulp which is higher than 70% (weight
concentration).
2. It is anti-static and abrasion resistant. The inclined tube is
processed with special polymer material features smooth and
hydrophobic surface. The tube surface do not contains slime.
Parameter
Models | Overall dimensions | Volume | Machine weight | ||||
Sediment area/q dip angle | A | B | C | C1 | C2 | ||
mm | m | kg | |||||
20/45° | 3127 | 1550 | 3976 | 2270 | / | 3.9 | 2116 |
30/45° | 3360 | 1880 | 4582 | 2900 | / | 7 | 2436 |
50/45° | 4180 | 2220 | 5856 | 3620 | 1000 | 11.6 | 3632 |
100/45° | 4922 | 2902 | 6636 | 2900 | 2900 | ||
20/55° | 2860 | 1550 | 4200 | 2270 | / | 3.9 | 1611 |
30/55° | 3159 | 1880 | 4823 | 2900 | 7 | ||
50/55° | 3862 | 2218 | 6143 | 3620 | 1000 | 11.6 | 4128 |
100/55° | 4588 | 2902 | 6916 | 4316 | 1000 | 6538 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine.
Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your
company provide spare parts?
Answer: The warranty period of our machine is one year. For those
wearing parts, we guarantee to provide high-quality parts for a
long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance
payment. Small machine is guaranteed to be delivered within one
month. Large-scale machine is guaranteed to be delivered within 2-3
months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation,
commissioning and operation guidance.