20FT R780 drilling high manganese steel welded drill pipe for water well drilling

Brand Name:BaiWei
Certification:ISO9001
Model Number:4.5"
Minimum Order Quantity:30pcs
Delivery Time:20-30 working days, which will be adjusted according to different products and inventory
Payment Terms:T/T
Contact Now

Add to Cart

Verified Supplier
Location: Langfang Hebei China
Address: Yongqing Industrial Zone, Langfang, Hebei, China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

High Manganese Steel API Oilwell Drill Pipe For Well Drilling


Product Description


1. The rod body is quenched and tempered, and its resilience and yield strength are strengthened
2. The joint shall be quenched and tempered with 42CrMo and the surface shall be nitrided as far as possible
3. Friction welding process between joint and rod body to ensure the strength and coaxiality of joint and rod body


OD
A
Wall
B
Length
L
Weight
lbs
ID
Pin C
Across
Flat D
Flat
Length E
Dist From
Shoulder F
Flat
Length G
Across
Flat H
Connection
3.5".315"20'2451.75"2.75"12.5"3.25"2.25"3.25"2 3/8IF
4.5".337"20'3451.75"3"12.5"3.25"2.375"4"3 1/2 Reg
4 1/2".337"20'3452 1/8"3"12 1/2"3 1/4"2 3/8"4"2 7/8 IF
4 1/2".337"25'4301 3/4"3"12 1/2"3 1/4"2 3/8"4"3 1/2 Reg
4 1/2".337"25'4302 1/8"3"12 1/2"3 1/4"2 3/8"4"2 7/8 IF
4 1/2".337"30'5101 3/4"3"12 1/2"3 1/4"2 3/8"4"3 1/2 Reg
4 1/2".500"25'5101 3/4"3"12 1/2"3 1/4"2 3/8"4"3 1/2 Reg
4 1/2".500"30'6151 3/4"3"12 1/2"3 1/4"2 3/8"4"3 1/2 Reg
4 1/2".750"25'8051 3/4"3"12 1/2"3 1/4"2 3/8"4"3 1/2 Reg
5".500"25'6951 3/4"3"12 1/2"3 1/4"2 3/8"4"3 1/2 Reg
5".500"30'7751 3/4"3"12 1/2"3 1/4"2 3/8"4"3 1/2 Reg
5".750"30'11001 3/4"3"12 1/2"3 1/4"2 3/8"4"3 1/2 Reg
5".750"25'9301 1/2"3"12 1/2"3 1/4"2 3/8"4 5/8"3 1/2 Beco
5 1/2".750"25'10451 1/2"3"12 1/2"3 1/4"2 3/8"4 5/8"3 1/2 Beco
5 1/2".750"30'12401 1/2"3"12 1/2"3 1/4"2 3/8"4 5/8"3 1/2 Beco

Drill pipe usage notes


1. New drill pipe should be pasted oil before connection
2. Make up and break at least 3 times before drilling
3. Hard bending and plastic coating can be processed according to clients’ special requirements






FAQ

Q: What is your delivery time?
A: It usually takes 20 days to produce. Within 3 days (if there is stock).

Q: How to control the quality?
A: Before shipping, we should check and test each drill rod.

Q: Do you agree to order samples?
A: Yes, we welcome your sample order to test our quality.

Q: Has your drill pipe been heat treated?
A: Yes, our heat treatment of drill pipe and casing.

Q: Does your drill pipe have anti-rust function?
A: Yes, each drill pipe and casing will be anti-rust with paint or anti-corrosion oil before transportation. If you need galvanized pipe, please contact us.

China 20FT R780 drilling high manganese steel welded drill pipe for water well drilling supplier

20FT R780 drilling high manganese steel welded drill pipe for water well drilling

Inquiry Cart 0