Product Details
Description of 3 in 1 with cap elevator CIP cleaning fruit juice
bottling line
The bottle is conveyed to the three-in-one filling machine by the
bottle air conveying system through the bottle star wheel. The
rotary plate of the bottle washing machine is equipped with a
bottle clamp, which clamps the bottle mouth and turns 180° along a
guide rail to make the bottle mouth downward. In a specific area of
the bottle washing machine, the nozzle sprays bottle washing
disinfectant or water to rinse the inner wall of the bottle. After
the bottle is rinsed and drained, the bottle is clamped by the
bottle clamp and then turned over 180° along the guide rail, so
that the bottle mouth is upward. The washed bottles are exported
from the bottle washing machine through the bottle star wheel and
transferred to the filling machine. The bottle entering the filling
machine is held by the bottleneck pallet stuck to the mouth of the
bottle. The filling valve is lowered and raised through the valve
lifting mechanism under the action of the cam. Filling adopts
negative pressure filling method. After the filling valve descends
to contact the bottle mouth, it opens to complete the filling
process. After filling, the filling valve rises to leave the bottle
mouth, and the bottle enters the capping machine through the
bottleneck transition dial. The anti-rotation knife on the capping
machine jams the bottleneck to keep the bottle upright and prevent
it from rotating. The capping head keeps revolving and rotating on
the capping machine, and realizes the actions of capping, capping,
capping, and capping under the action of the cam to complete the
entire capping process. The finished bottles are conveyed from the
capping machine to the bottle conveying chain through the bottle
discharging dial wheel, and the three-in-one bottle filling machine
is conveyed by the conveying chain. The whole equipment is closed
by a window seal, the height of the window seal is higher than the
highest point of the equipment, proper passages are reserved at the
bottle inlet and outlet, and an exhaust trough is reserved at the
bottom of the window seal.
Equipment list of the whole RCGF8-8-3 0-2L bottle middle
temperature juice filling line
Items | Name of machine | Model | Size(mm) | Qty. |
1, 1500LPH flavor juice making line |
1.1 | Juice mixing tank | 1500L | ∮1120*2200 | 2set |
1.2 | Double filter | SL-2 | 800*350*800 | 1set |
1.3 | Homogenizer | JJ1.5-25 | 1130*850*1200 | 1set |
1.1.1 | Balance tank | 200L | ∮650*1700 | 1set |
1.4 | Electrical oil Coil UHT | 1500L/h | 2500*1200*1850 | 1set |
1.2.1 | Buffer tank | 500L | / | 1set |
1.5 | Heat exchanger | BR0.13-4 | 800*400*950 | 1set |
1.6 | Drink pump | / | / | 2set |
1.7 | Sus pipe-connection | DN25 | / | 1suit |
2, RCGF8-8-3 small bottle middle temperature juice filling line |
2.1 | Monoblock 3 in 1 washer-filler-capper unit | RCGF8-8-3 | 2100*1600*2100 | 1set |
2.1.1 | Air conveyor | FS-1 | 2.2m | 1set |
2.1.2 | Belt conveyor | SYS-1 | 4m | 1set |
2.1.3 | Light checker | DJ-1 | 800 | 1pc |
2.2 | Blow dryer | CG-1 | 1000*600*1800 | 1set |
2.3 | Single adhesive labeling machine for round bottles | T-751 | 1600*1200*1500 | 1set |
2.4 | Ink jet code printer | OH-338 | 347*220*100 | 1set |
2.5 | Semi-auto shrink packing machine | 5538+5040 | 3600*950*1680 | 1set |
2.9 | Extra conveyor | / | 1 linear | 1suit |
Caps conveyor road:
Company Profile
ZhangJiaGang City BOTTLING Machinery Co.,Ltd. which was originally
set up as an factory in 2011,the company is growing up time by time
in research and design, quality and production, sales and after
sale service. Our machineries are sold to more than 50 countries in
the world and over cross domestic.
We specialize in producing beverage filling-packing equipments and
water treatment equipments. The quality already pass drinkable
standard.At present we produce: production lines for mineral water,
pure water, fruit juice,tea drink,milk drink and carbonated drink
with capacity 1000-20000bottles/hour; production lines for vinegar,
soy sauce and wine 1000-20000bottles/hour; 3-5 gallon barreled
water with capacity 60-1200 barrels per hour and water treatment
plants 1-30 ton/hour; We provide separate machinery or turnkey
project.
Our products pass quality inspection executed by Bureau of Quality
and Technical Supervision every year. We pass Italy CE inspection
in 2011;
We have full-time development and design engineer team, we absorb
technologies from Germany, Japan, France, Italy, Switzerland,
combined with China's national conditions to develop high starting
point and advanced technology filling equipments, degree of
automation to achieve the advanced level.
We own 3700 square meters modern factory in accordance with
ISO9001: 2000 certification system standards with all kinds of
advanced processing equipment and testing equipment, experienced
technicians, scientific and strict management, all constitute
BOTTLING excellence in product manufacturing system, which provides
the strongest protection for BOTTLING product quality.
We believe in BOTTLING’s future while you choose us!