Bridge erecting machine: bridge erecting machine is not only an
important construction equipment for bridge erecting, but also a
large-scale mechanical equipment. After installation and
commissioning, passing through the hole is a step of beam erecting
construction, which is also a very important step. Therefore, the
bridge erecting machine needs to pay attention to many matters when
passing through the hole. Some main matters are listed below for
reference.
1. Attention should be paid to the specific conditions of the
bridge, such as curve, vertical and horizontal slope and slope,
which should be carefully observed and analyzed before passing
through the hole. If necessary, actual measurement is needed.
2. In general, the span of the bridge erecting machine is large,
and the expansion joints at both ends of the bridge are strong.
3. When going downhill, the front outrigger is long. In addition,
it is necessary to pay attention that the telescopic cylinder
should not extend too long out of the guide cylinder (the cylinder
stroke should not extend too much).
4. When the bridge crane passes through the hole, the front
carbonyl is generally slightly higher than the rear carbonyl, and
attention should be paid to the completion of the hole, not to stop
halfway. The front and middle track beams should be kept horizontal
as far as possible. The front outrigger cushion sleeper should not
be too close to the edge of the cap beam, leaving a certain space
for the beam, and then it should be in the middle. The steel wire
rope of the counterweight beam and the hoist must be tightened, but
it cannot be lifted off the trolley. It is particularly noted that
when going up or down the slope, as the rear support approaches the
middle support, the tightness of the steel wire rope must be
observed and the hoist adjusted. In short, the steel wire rope must
be in a tightened state. When lifting the counterweight beam, it is
easy to use the rear crane.
5. The front and rear crown block must be firmly fixed with the
main beam, and the bad phenomena such as car sliding and sliding
are not allowed. The front outrigger must be crossed and tightened
with chain block. The span of the hole is: bridge span + 4m +
expansion joint reservation.
In a word, it is very important for the bridge erecting machine to
go through the hole when erecting the beam. We must follow the
operating procedures and strictly control the safety matters. QJ
180t-40m bridge erecting machine. The bridge erecting machine is a
kind of steel structure rail type precast beam hoisting and
erection equipment with wide operation range, good performance,
convenient operation and safe structure. In the process of erecting
the side beam, the bridge erecting machine should be especially
careful, the lifting should be stable, the beam should be
accurately dropped, and it is not allowed to walk out of the
suspended track. The product has the advantages of simple
structure, convenient operation and maintenance, good safety and
reliability, and can effectively reduce the potential safety
hazard.
Technical parameters and performance table of Bridge Erector | |||||||
50m | 40m | 30m | |||||
model | JQJ200/50 | JQJ180/50 | JQJ160/50 | JQJ140/40 | JQJ120/40 | JQJ100/30 | JQJ80/30 |
Lifting capacity | 200t | 180t | 160t | 140t | 120t | 100t | 80t |
Applicable bridge span | 30~50m | 20~40m | 20~30m | ||||
Applicable maximum gradient | Longitudinal slope £ 5% cross slope £ 5% | ||||||
Trolley lifting speed | 0.40m/min | 0.45 m/min | 0.5 m/min | 0.56 m/min | 0.65 m/min | 0.75 m/min | 0.9 m/min |
Crown block longitudinal speed | 3 m/min | ||||||
Traverse speed of crown block | 3 m/min | ||||||
Speed of bridge crane through hole | 3 m/min | ||||||
Traverse speed of bridge crane | 3 m/min | ||||||
Adapt to the angle of skew bridge | 0~45° | ||||||
Suitable radius of curved bridge | 400m | 300m | 200m |