20T Railway Workshop Equipment , Railway Vehicle Dummy Bogie

Brand Name:Heqiang Machinery
Certification:ISO9001
Model Number:HQ61
Minimum Order Quantity:2 pcs
Delivery Time:120 days after advance payment & design finalization
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Location: Ezhou Hubei China
Address: No.55 Edong avenue, Xinmiao industrial park, Ezhou, Hubei, China 436004
Supplier`s last login times: within 26 hours
Product Details Company Profile
Product Details

Railway Dummy Bogies , Each With 20 Tons Capacity

Application scope:
The Dummy Bogie is the special tooling equipment, to meets the needs of various types of railway car, to replace bogies, to carry the vehicle body to complete body to move between the repair station after the separation of the body and the bogie.

Technical Parameters:

Max Capacity of each process bogie20 tons
Track gauge1435 mm
Wheelset inner distance1353±2 mm
Wheel diameter400~450 mm
Bogie Height1700 mm
Weight of each process bogieNot more than 5 tons
Wheelbase1300 mm
Central distance of side support1660~1880 mm (adjustable)
Control modePushed by external forces
Designed lifespan30 years

(*The detail parameters can be adjusted as per customer's actual requirements.)

Main Features:

  • The dummy bogies are to replace the bogies to complete the displacement, support and positioning of the railway car body. Every two process bogies can complete the positioning support of a car body, which can be easily pushed by manpower, and can move along the track at low speed with the car body.
  • Each process bogie is equipped with four independent wheels. It can replace the displacement support and positioning function of the original bogie on the car body, and the car body can move smoothly under the action of external forces.
  • The process bogie can keep the car body stable when supporting and positioning, which has the same function as the bogie.
  • the central distance of the positioning parts on both sides can be adjusted to adapt to different metro models (A, B and C), and the maximum distance is 1880 mm.
  • The bearing positioning surface can be adjusted up and down on the supporting platform through the screw, and the supporting platform can be adjusted in the width direction on the left and right sides of the frame. To achieve safe and reliable docking with metro vehicle body and locomotive. The side support can be adjusted up and down, left and right, with positioning pin installation holes, which are consistent with the positioning holes on the metro train body.
  • The upper surface of the support in contact with the car body is made of nylon plate, which is anti-skid, wear-resistant, and can protect the car body from damage. Under the action of side support and center positioning support, the process bogie can keep the car body stable without tilting and displacement.
  • The process bogie frame has enough rigidity and strength to ensure the relative position of wheelset and supporting parts and the stability and reliability of car body.

Technical Documents:
The following technical documents will be supplied along with the equipment when delivery in hard copy and soft copy in English language (provide E-copy to the buyer before delivery):

  • Operating and maintenance instruction manual;
  • General arrangement drawing;
  • Spare part list, Special tool list;
  • Product certificate / Factory Acceptance Certificate, etc
China 20T Railway Workshop Equipment , Railway Vehicle Dummy Bogie supplier

20T Railway Workshop Equipment , Railway Vehicle Dummy Bogie

Inquiry Cart 0