315/355/400/500/630mm 12"-24"inch PVC UPVC Pipe Production Line With HYPS120/28 Parallel Twin Screw Extruder

Brand Name:Hypet
Certification:ISO9001, CE
Model Number:PS120/28 315-630mm PVC pipe making machine production line
Minimum Order Quantity:1set
Delivery Time:315-630mm PVC pipe making machine 45working days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: ROOM 2205 ANGEL BUILDING 4 ROAD BAGUA, SHENZHEN, CHINA
Supplier`s last login times: within 31 hours
Product Details Company Profile
Product Details


Production Line Brief introduction:

SNItemsspecification
1Electric wiresSelect high purity copper wires with high quailty insulating material
2Over load protectionOverload protection for all motors with heat relay and circuit breakers, and heater and cooling will be protected by circuit breakers
3Phase protectionElectric cabinet must be with Phase Sequence and phase failure protection
4Additional heater zones3 additional temperature control zones of barrel system will be added.
5Additional heater zones3 additional temperature control zones of die heat system will be added.
6Add Spare partsVacuum /water pumps, and gear box with motor for haul off , cutter hydraulic parts etc, see the spare parts list.
7Water level controlThe water level control should be electrical level control
8Water inlet and outletThe water inlet and outlet should be automatic valve controlled
9Motor driven controlDRIVE of the extruder main motor to be DELTA.
10Vacuum tank panelvacuum tank control panel should include speed indicator of the haul off.
11Main control panelThe main control unit should include a synchronization switch for the speed of main extruder, feeder and haul off simultaneously and relatively with each other and to keep synchronization between them.
12Motor couplingThe main motor coupling will be the same as before
13panel directionThe control panel direction will be the same as before
14Guarantee timeGuarantee time is one year after the machine commissioning finished.
15Maintenance manualTwo copies of Maintenance manual
16Lubricants requirementthe specification of lubricants
17PLC softwarePLC software will be offered together with the machine
18Operation manualTwo copies of Operation manual

HYPS120/28 parallel twin screw extruder with 315-630mm PVC pipe production line :

Pipe Dia mm315-630mm
ApplicationPVC Pipe
Output900kg/h
Act speed0.5-1.2 m/min
ExtruderHYPS120/28-110kw
die sizes315/400/500/630
Vacu Tank9 m Vacu *1
Cool Tank6m Cool *1
Haul Off6 claws Servo
Cutterplanety+chafer
Stacker4 m

Remarks:

1. Condition of the price and destination Ex-works Wuhan China

2. Payment method: 40% of the total will be paid by T/T as deposit, the balance will be paid after testing and before shipping by T/T or by irrevocable L/C on time .

3. Delivery period: 70 days after received the deposit.

4. Validity period: 30 days after ensured

5. Warranty: one year for normal, barrel and screw and gear box is for 1.5 years

6. Training: both in china and in the customer shop are available.

7. If necessary, The supply can send the engineers to the buyer for commission under the condition.


Technical specification:


SNParts nameSpecificationDescription
1ExtruderExtruder modelHYPS-120/28 Paralllel twin screw

Output980-1050kg/h for pipe
Center height1150mm
Dimension5200 x 1600 x 2605mm
Weight7200kg
2ScrewDiameterØ120 mm
L/D28:1 for pipe production.
Material38CrMoAlA + special alloy
FinishNitrogen-filled (0.50~0.70mm depth) and polish
Rotate speed0~45 r/min
Core of the screwAuto control for temperature
3BarrelBarrel Structure38CrMoAlA + special alloy
Inside finishNitrogen-filled (0.50~0.70mm depth)

4

Temp/ pressure transducerQualityChina famous brand
StructureSeparately senses both in pressure and temperature
CableHigh isolated cable line
ScreenBoth in monitor or screen display
5Heater and cooling fansHeating control area7 zones
Heating wayCast aluminum/ ceramics
Additional temp control3 zones for additional
Heating power65 kW
Cooling systemLow-noisy barrel cooling fan
Cooling power0.75 kW x4 sets+0.75kWx2 sets
Water/oil coolingOne zone in front part for option
Heat isolatingSpecial isolating material and structure for energy saving.
6HYPET Gear boxHousing materialDuctile iron
Gear material20CrMnTiA
Gear surfaceHardened and ground in high precision
Axis material40Cr
Temperature of oilControlled by two system,
Rubber sealerImported specal rubber sealer used
BearingsWith famous and reliable brand.
7

Twin screw Dosing

feeder

Supplying material motor1.5 kW
Speed range1-50 RPM
Powder bridgeAnti powder bridge with high Caco3
InverterDELTA. heavy loader type
8Vacuum degas with selectorVacuum degree-0.04Mpa
Motor power4 kw
Vacuum tankEasy to be clean
Auto clean deviceAir control auto Clean device for option.
9Driving motorAC motor power110 kW in Siemens brand
AC inverter controllerDELTA inverter in heavy type
10Electrical Control systemElectric elements independent controlThe main control system will be controlled by each electric elements.
Electric components brandBranded in Siemens, Schneider RKC DELTA., FUJI, and small unimportant parts in China famous brand
Temperature zone die head18 zones
Additional Temp zones3 zones
Electric cabinet feature

1, all cable and connectors are with Wire aviation plug

2, electric cabinet can be disassembled with easy,

3, all cables and senses cables are strong enough with long life .


Afte -sales Service

Itemsquantity
Guarantee period1 year but he service is available lifelong, during guarantee period the cost of the components will be covered by the seller except the easy broken parts and damaged parts by the human reason
Training before shippingBuyer’s technical person can be sent to china before shipping for training and operating, for 7-10 days
Technical documentsElectric principle drawing, operation manual, and electric parts manual etc
Seller engineersSeller can send the engineers ot the buyer factory for commissioning and training. But the cost caused by the seller experts in the customer country will be covered by the buyer, including shuttle trip tickets inland traffic medical fee, lodging dinner and also 100 USD /day /one person as salary for the enigneers .
Contacts wayWhatsapp, wechat, mobile, etc +86 13823232106
Company email :info@hypet.com.cn
Cooperative Brands:
Exhibition:
China 315/355/400/500/630mm 12-24inch PVC UPVC Pipe Production Line With HYPS120/28 Parallel Twin Screw Extruder supplier

315/355/400/500/630mm 12"-24"inch PVC UPVC Pipe Production Line With HYPS120/28 Parallel Twin Screw Extruder

Inquiry Cart 0