Add to Cart
Double Screw Extruder Small Plastic Extruding Machine For Upvc Profile Making Hyzs45/100
HYPET advantages of double screw extruder
High-speed extrusion, with high capacity and low power consumption;
Barrel---in two parts, and totally hard alloy ensure 2 years;
Gear box --- made by HYPET, with world advanced technology;
Output--- top amount as compared at the same sizes and power;
Electrical cabinet --- Plc controller auto type in good soft ware;
Energy saving --- 10%-20% energy saving.
Configuration list
Note: This table as attached file which is for selection of the configuration on the extruder.
SN | Items | Choosing configuration | Other option |
1 | Production control system | Siemens PLC control system | Digital control optional |
2 | Cooling system of the main control electric cabinet | Fan cooling | Air conditioner optional |
3 | Main motor | AC motor with famous inverter | DC optional |
4 | Pressure sensor | HYPET individual temperature and pressure control in two parts | Dynisco is for option |
5 | Core temperature adjustment control | Internal closed loop heat balancing system. | External heat control optional |
Condition of use
1. Technical features
SN | Specification | Description | Remark |
1 | Suitable material | PVC powder | |
2 | Max. output | 70-110kg/h for PVC pipe | |
3 | Test and accept | Based on HYPET standard formula. | |
4 | Center height | 1000mm | |
5 | Dimension | 2.800 x 1,450 x 2,552mm | |
6 | Operation direction | From right to left | |
7 | Color of equipment | HYPET white color | |
8 | Control of whole production | Refer to the “configuration list”. | |
Note | Extrusion capacity will be changed according the processing material and working conditions |
2. Circumstances condition
SN | Condition | Specification | Description |
1 | Natural circumstance condition | Working place | Indoor use |
Power source | No dangerous area | ||
Humidity | 85% no condensation | ||
Temperature | 0~40 ℃ | ||
2 | Electricity source | Installation capacity | 50 kW |
Power supply | 3P+N+PE | ||
Voltage/Frequency | 380V/50Hz other can be option | ||
3 | Cooling water | Temperature | ≤15 ℃ |
Water pressure | ≥0.3MPa | ||
Flow | ~15 m3/h | ||
4 | Air condition | Compressor air pressure | ≥0.6MPa |
Flow | ~0.9 m3/min |
Main specification for double screw extruder
SN | Parts name | Specification | Description |
1 | Extruder | Extruder model | HYZS-45/100 conic double screw extruder |
Output | 70-100kg/h | ||
Center height | 1000mm | ||
Weight | 2200kg | ||
2 | Screw | Diameter | Ø45/100 mm |
Material | 38CrMoAlA + special alloy | ||
Finish | Nitrogen-filled (0.50~0.70mm depth) and polish | ||
Rotate speed | 0~38 r/min | ||
Core of the screw | Auto control for temperature | ||
3 | Barrel | Material | 38CrMoAlA with bi-metal type |
Inside finish | Nitrogen-filled (0.50~0.70mm depth) and rubbing | ||
Heating control area | 3 zones | ||
Heating way | Cast aluminum/ ceramics | ||
Heating power | 11 kW | ||
Cooling system | Low-noisy barrel cooling fan | ||
Cooling power | 0.11kwx3 sets | ||
4 | Gear box | Housing material | Ductile iron QT-500 |
Gear material | 20CrMnTi | ||
Gear surface | Hardened and ground in high precision | ||
Axis material | 40Cr | ||
5 | Twin screw Dosing feeder | Supplying material motor | 1.1 kW |
Speed range | 1-50 RPM | ||
Inverter | ABB heavy loader type | ||
6 | Vacuum degas with selector | Vacuum degree | -0.004Mpa |
Motor power | 1.1 kW | ||
7 | Driving motor | AC motor power | 11 kW |
AC inverter controller | ABB |
8 | Electrical Control system | Detachable control panel | Siemens PLC control system |
Extra temperature zone for die head | 5 zones | ||
Components brand | Siemens, RKC, ABB, etc. | ||
Digital control system is available |
Terms & conditions
2. Installation and debugging
When the machine arrives at site, the customer should install it on the appropriate position according to the specifications provided by the supplier; and then the supplier should send its engineers to the site if requirement approved,in order to instruct the customer about trial run and debugging. The customer should provide necessary conditions for trial run and provide materials for trial run, and should decide the processing conditions in trial run with consideration of the supplier's opinions.
1) The price covers the pre-commissioning of the machinery before shipment at Seller's site. The Seller is obliged to test the performance of machinery.
2) The Buyer is obliged to provide suitable space, tools and manpower for the commissioning of the order.
3) This Price does not included commission and installation in buyer’s factory.
3. Pricing
1) The above mentioned quotation is valid within 30 days counted from the issue date of quotation.
2) The price and machinery configuration should be updated and confirmed by the Seller in the case that the quotation has been beyond the validity period.
3) The above mentioned quotation is based on Ex works. Sea transportation and wooden case packing is excluded.
4) The price does not cover the cost of testing material. The testing material will be supplied by the Buyer. Or the Seller will purchase the material as requested by the Buyer at Buyer's cost.
5) The price does not include the cost of commissioning at Buyer's site.
The Seller reserves the right to modify the specification and design of the machine in order to enhance the product quality.
4. Terms of payment
1) T/T and L/C (irrevocable, at sight) both are acceptable.
2) 35% of the total contract value should be paid in advance, balance 65% of the total value is to be paid before shipping at the Seller’s factory.
5. Time of delivery
1) When the contract becomes valid, the machine should be delivered within 50 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.
2) During production, provided that the Buyer requests to modify the specification of the order, the Buyer shall notify the Seller of this modification in written form. Upon receipt of the notice, the Seller will quote to the Buyer the cost of this modification and notify the Buyer of any possible delay due to this modification.