Home /Plastic Product Making Machinery /

Plastic Pipe Haul Off Unit / Haul Off Machine for pipe making

Plastic Pipe Haul Off Unit / Haul Off Machine for pipe making

Brand Name:HYMAX
Certification:CE ISO9001
Model Number:Plastic Pipe Haul Off Unit / Haul Off Machine
Minimum Order Quantity:Plastic Pipe Haul Off Unit / Haul Off Machine 1 set
Delivery Time:Plastic Pipe Haul Off Unit / Haul Off Machine10-30 work days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: Xianke Building Bagua 4th Rd Shenzhen China
Supplier`s last login times: within 31 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Plastic Pipe Haul Off Unit / Haul Off Machine For Pipe Making


Plastic Pipe Haul Off Unit / Haul Off Machine Application

Special designed for PVC, PPR, PE extrusion line, suitable for tracking different size of pipes, profile, board and so on


Plastic Pipe Haul Off Unit / Haul Off Machine Haul off unit model list

ModelRange(mm)SuitableBelt qtyHaul length(mm)
324x16-32PVC2clawX41000
632x 20-63PVC2clawX21100
11020-110PVC2claws1300
110 fast20-110PVC2 claws1300
1102x 63-110PVC2clawsX21400
16050-160PVC2claws1500
16050-160PVC3claws1500
20090-200PVC2claws1600
20090-200PVC3claws1600
250110-250PVC4claws1600
315160-315PVC4claws1800
400200-400PVC4claws1800
450200-450PVC6claws with servo1800
500250-500PVC6 claws with servo2000
630315-630PVC6claws with servo2100

Plastic Pipe Haul Off Unit / Haul Off Machine

ModelRange
(mm)
Pipe materialBelt qtyLength(mm)
2x 20-32PE/PPR2clawsX21000
632x 20-63PE/PPR2clawsX21100
6320-63PE/PPR2claws1100
11020-110PE/PPR2claws1300
110 high speed20-110PE/PPR2claws1400
16050-160PE/PPR2claws1500
16050-160PE/PPR3claws1500
20050-200PE3claws1600
25075-250PE4claws1600
315110-315PE4claws1800
400110-400PE4claws1800
450160-450PE6claws1800
500160-500PE6claws2000
630200-630PE6claws2100
800315-800PE8claws2300
1000400-1000PE10claws2500

Plastic Pipe Haul Off Unit / Haul Off Machine


Plastic Pipe Haul Off Unit / Haul Off Machine Terms & conditions

1. Plastic Pipe Haul Off Unit / Haul Off Machine Training and services

1) Instruction of field installation

2) Equipment field debugging and trial run if required by the buyer according to the rule.

3) Training on field operation and maintenance for customer's personnel.

4) Provide technical consultation service on long-term basis.


2. Plastic Pipe Haul Off Unit / Haul Off Machine Installation and debugging

When the machine arrives at site, the customer should install it on the appropriate position according to the specifications provided by the supplier; and then the supplier should send its engineers to the site if requirement approved,in order to instruct the customer about trial run and debugging. The customer should provide necessary conditions for trial run and provide materials for trial run, and should decide the processing conditions in trial run with consideration of the supplier's opinions.

1) The price covers the pre-commissioning of the machinery before shipment at Seller's site. The Seller is obliged to test the performance of machinery.

2) The Buyer is obliged to provide suitable space, tools and manpower for the commissioning of the order.

3) This Price does not included commission and installation in buyer’s factory.


3. Plastic Pipe Haul Off Unit / Haul Off Machine Pricing

1) The above mentioned quotation is valid within 30 days counted from the issue date of quotation.

2) The price and machinery configuration should be updated and confirmed by the Seller in the case that the quotation has been beyond the validity period.

3) The above mentioned quotation is based on Ex works. Sea transportation and wooden case packing is excluded.

4) The price does not cover the cost of testing material. The testing material will be supplied by the Buyer. Or the Seller will purchase the material as requested by the Buyer at Buyer's cost.

5) The price does not include the cost of commissioning at Buyer's site.

The Seller reserves the right to modify the specification and design of the machine in order to enhance the product quality.


4. Plastic Pipe Haul Off Unit / Haul Off Machine Terms of payment

1) T/T and L/C (irrevocable, at sight) both are acceptable.

2) 35% of the total contract value should be paid in advance, balance 65% of the total value is to be paid before shipping at the Seller’s factory.


5. Plastic Pipe Haul Off Unit / Haul Off Machine Time of delivery

1) When the contract becomes valid, the machine should be delivered within 60 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.

2) During production, provided that the Buyer requests to modify the specification of the order, the Buyer shall notify the Seller of this modification in written form. Upon receipt of the notice, the Seller will quote to the Buyer the cost of this modification and notify the Buyer of any possible delay due to this modification.


6. Plastic Pipe Haul Off Unit / Haul Off Machine Debugging charge

The buyer pays for the plane ticket of round-trip abroad and food and accommodation of buyer’s country during debugging. And the wage of technicians should be paid by the customer (80USD/day).


7. Plastic Pipe Haul Off Unit / Haul Off Machine Guarantee clause

1) Guarantee is 1 year (excluding human factor and wearing parts).

2) Under proper working conditions, 12 months from the date of completion of commissioning at the buyer's site, and should be at the latest within 14 months from the issuing date of Bill of Lading.


China Plastic Pipe Haul Off Unit / Haul Off Machine for pipe making supplier

Plastic Pipe Haul Off Unit / Haul Off Machine for pipe making

Inquiry Cart 0