Add to Cart
High Speed Mixer For Pvc Compounding Cold And Hot Mixer
High Speed Mixer For Pvc Compounding Cold And Hot Mixer Main model:
SRL-Z200/500; SRL-Z300/600; SRL-Z500/1000
High Speed Mixer For Pvc Compounding Cold And Hot Mixer Application:
The output for this mixer is 70kg/batch
SRL series mixers are suitable for all resins (such as polyvinyl
chloride, polythene, polypropylene, etc,), They are mainly used in
all kinds of plastic materials mixing, coloring, drying and etc,
and in plastics, rubber, food-stuff, daily chemical industry and so
on.
High Speed Mixer For Pvc Compounding Cold And Hot Mixer Features:
1. SRL series mixers adopt advanced design and can be operated
easily, safely and reliably. The size is small and they are light,
with high efficiency, low energy consumption and low noise.
2. Even mixed material, quicker mixed speed, proper to control
temperature, high automatic system and easy to operate are the
distinctive characteristics.
High Speed Mixer For Pvc Compounding Cold And Hot Mixer Main Technical Parameters:
Mode: SRL-Z500/1000
Machine Name | Type | Specification | Description |
Mixer 500/1000 | Hot mixing tank | Hot mixing general capacity | 500L |
Hot mixing effective capacity | 375L | ||
Feeding capacity | ≤160kg/pan | ||
Output | ≤800kg/h | ||
Motor power | 75 kW AC Motor | ||
Hot mixing tank material | 1Cr18Ni9Ti | ||
Tank wall thickness | 8mm (1Cr18Ni9Ti) | ||
Tank bottom thickness | 10mm (1Cr18Ni9Ti) | ||
Mixing time | ≤10min/pan( model material ), ≤12min/pan (pipe material ) | ||
Cold mixing tank | Cold mixing cubage | 1,000L | |
Cold mixing effective cubage | 640L | ||
Motor power | 18.5 kW | ||
Mixing blade material | ZGlCr18Ni9Ti | ||
Tank wall thickness | 6mm | ||
Tank bottom thickness | 10mm (Jointing after pressing in shape for clearing ) | ||
Mixing blade rotating speed | 60 r/min | ||
Vertical moving control | Pneumatic | ||
Cooling time | ≤10min/pan | ||
Electric control cabinet | 800 x 500 x 1800mm | ||
Weight | 5800kg | ||
Dimension | 5,580 x 2,700 x 3,432mm |
High Speed Mixer For Pvc Compounding Cold And Hot Mixer Terms & conditions
1. Training and services
1) Instruction of field installation
2) Equipment field debugging and trial run if required by the buyer
according to the rule.
3) Training on field operation and maintenance for customer's
personnel.
4) Provide technical consultation service on long-term basis.
2. Installation and debugging
When the machine arrives at site, the customer should install it on
the appropriate position according to the specifications provided
by the supplier; and then the supplier should send its engineers to
the site if requirement approved,in order to instruct the customer
about trial run and debugging. The customer should provide
necessary conditions for trial run and provide materials for trial
run, and should decide the processing conditions in trial run with
consideration of the supplier's opinions.
1) The price covers the pre-commissioning of the machinery before
shipment at Seller's site. The Seller is obliged to test the
performance of machinery.
2) The Buyer is obliged to provide suitable space, tools and
manpower for the commissioning of the order.
3) This Price does not included commission and installation in
buyer’s factory.
3. Pricing
1) The above mentioned quotation is valid within 30 days counted
from the issue date of quotation.
2) The price and machinery configuration should be updated and
confirmed by the Seller in the case that the quotation has been
beyond the validity period.
3) The above mentioned quotation is based on Ex works. Sea
transportation and wooden case packing is excluded.
4) The price does not cover the cost of testing material. The
testing material will be supplied by the Buyer. Or the Seller will
purchase the material as requested by the Buyer at Buyer's cost.
5) The price does not include the cost of commissioning at Buyer's
site.
The Seller reserves the right to modify the specification and
design of the machine in order to enhance the product quality.
4. Terms of payment
1) T/T and L/C (irrevocable, at sight) both are acceptable.
2) 35% of the total contract value should be paid in advance,
balance 65% of the total value is to be paid before shipping at the
Seller’s factory.
5. Time of delivery
1) When the contract becomes valid, the machine should be delivered
within 60 days since receipt of the advance payment. And the
equipment will be in normal operation after debugging within two
weeks after arrival.
2) During production, provided that the Buyer requests to modify
the specification of the order, the Buyer shall notify the Seller
of this modification in written form. Upon receipt of the notice,
the Seller will quote to the Buyer the cost of this modification
and notify the Buyer of any possible delay due to this
modification.
6. Debugging charge
The buyer pays for the plane ticket of round-trip abroad and food
and accommodation of buyer’s country during debugging. And the wage
of technicians should be paid by the customer (80USD/day).
7. Guarantee clause
1) Guarantee is 1 year (excluding human factor and wearing parts).
2) Under proper working conditions, 12 months from the date of
completion of commissioning at the buyer's site, and should be at
the latest within 14 months from the issuing date of Bill of
Lading.