Home /Cooling Tower /

Cooling Water Tower Volum From 10t To 200t

Cooling Water Tower Volum From 10t To 200t

Brand Name:HYMAX
Certification:CE, ISO9001
Model Number:Cooling Water Tower
Minimum Order Quantity:Cooling Water Tower 1 set
Delivery Time:Cooling Water Tower 10-30 work days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: Xianke Building Bagua 4th Rd Shenzhen China
Supplier`s last login times: within 31 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Cooling Water Tower Volum From 10t To 200t ​


Cooling Water Tower Features:
1. Suspension structure: stainless steel structure, painted with epoxy-(coal)tar or Chlorosulfonated polyethylene after

plated with zinc

2. Enclosure structure: polyester glass steel, with light weight, high strength corrosion resistant, anti aging, long

service life
3. Air duct: Kinetic energy recovery type, reasonable air distribution with high efficiency
4. Fan: aerofoil epoxy-(coal)tar blade, features big air flow, high efficiency, low noise and corrosion resistance


Cooling Water Tower Design condition:

Inlet temperature 37°C, outlet 32°C; temperature difference 5°C;

Wet bulb temperature 27°C, and atmospheric pressure 99400Pa.

Specifications and dimensions are subject to change without notice.


Cooling Water Tower


Cooling Water Tower Terms & conditions

1. Cooling Water Tower Training and services

1) Instruction of field installation

2) Equipment field debugging and trial run if required by the buyer according to the rule.

3) Training on field operation and maintenance for customer's personnel.

4) Provide technical consultation service on long-term basis.


2. Cooling Water Tower Installation and debugging

When the machine arrives at site, the customer should install it on the appropriate position according to the specifications provided by the supplier; and then the supplier should send its engineers to the site if requirement approved,in order to instruct the customer about trial run and debugging. The customer should provide necessary conditions for trial run and provide materials for trial run, and should decide the processing conditions in trial run with consideration of the supplier's opinions.


3. Cooling Water Tower Pricing

1) The above mentioned quotation is valid within 30 days counted from the issue date of quotation.

2) The price and machinery configuration should be updated and confirmed by the Seller in the case that the quotation has been beyond the validity period.

3) The above mentioned quotation is based on Ex works. Sea transportation and wooden case packing is excluded.

4) The price does not cover the cost of testing material. The testing material will be supplied by the Buyer. Or the Seller will purchase the material as requested by the Buyer at Buyer's cost.

5) The price does not include the cost of commissioning at Buyer's site.

The Seller reserves the right to modify the specification and design of the machine in order to enhance the product quality.


4. Cooling Water Tower Terms of payment

1) T/T and L/C (irrevocable, at sight) both are acceptable.

2) 35% of the total contract value should be paid in advance, balance 65% of the total value is to be paid before shipping at the Seller’s factory.


5. Cooling Water Tower Time of delivery

1) When the contract becomes valid, the machine should be delivered within 60 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.

2) During production, provided that the Buyer requests to modify the specification of the order, the Buyer shall notify the Seller of this modification in written form. Upon receipt of the notice, the Seller will quote to the Buyer the cost of this modification and notify the Buyer of any possible delay due to this modification.


7. Cooling Water Tower Guarantee clause

1) Guarantee is 1 year (excluding human factor and wearing parts).

2) Under proper working conditions, 12 months from the date of completion of commissioning at the buyer's site, and should be at the latest within 14 months from the issuing date of Bill of Lading.


China Cooling Water Tower Volum From 10t To 200t supplier

Cooling Water Tower Volum From 10t To 200t

Inquiry Cart 0