PVC Conduit Pipe Making Machine Four stations output 14tons With Full Automatic Packaging

Brand Name:SHENZHEN HYPET
Certification:CE,ISO
Model Number:HY4x32
Minimum Order Quantity:1set
Delivery Time:PVC Conduit Pipe Making Machine 35days
Payment Terms:L/C, T/T, D/P, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: ROOM 2205 ANGEL BUILDING 4 ROAD BAGUA, SHENZHEN, CHINA
Supplier`s last login times: within 31 hours
Product Details Company Profile
Product Details

PVC Conduit Pipe Making Machine Four Stations Output 14tons With Full Automatic Packaging


PVC Conduit Pipe Making Machine Special features:

  1. High output, max reach 300kg/h.
  2. No need labor package the pipes, we offer full automatic package machine for option.
  3. Automatic package machine has wrap, heat, sewing way for option.
  4. PLC control system make operation easily in one position.
  5. Working records support to find the best less energy comsuption formula and operation.

PVC Conduit Pipe Making Machine Production line:

SNParts nameQuantity
1Conic twin screw extruder HYZS-65/1321 set
2Siemens PLC control system additional cost for option.1 set
3Auto-loader for extruder in spring type.1 set
4

Die head for Four pipe:16, 20, 25, 32mm, in 2~3 pressure grade.

1 set
5Auto control vacuum tank in 6m in four station1 set
6Haul off unit in four station, is 2 claw with 4 rows type1 set
7Dustless cutter in four station1 set



PVC Conduit Pipe Making Machine Autopackaging machine:

SpecificationDescription
Production pipe diameter rangeØ16-Ø30mm
Strapping film material & thicknessLLDPE stretchable film, thickness: 0.03~0.05mm
Strapping film width50 mm
Strapping film plastic core OD40 mm
Strapping film outer diameter140 mm
Stretch film laps3 turns (adjustable)
Number of strapping sections Pipe length≤3000 mm is three sections, >3000 mm is four sections, which can be adjusted according to actual conditions.
Strapping and winding position150 mm ± 50 sections at both ends of the pipe. The pipe is automatically calculated according to the length of the pipe and the bundling position is calculated.
Bag material PE bag0.04~0.06mm
Bag width225mm (0~+10)
Bag core diameter76mm
Bag roll outer diameter300mm
Packing methodWinding&bundling, bagging (PE film), bag end heat seal.
Pipe counting methodMechanical baffle counting and stainless steel trough both ends with weighing sensor weighing and counting double counting function simultaneously counting to ensure accurate counting
Binding packaging data
Nominal outer diameter (mm)Packing quantity (bar / tie)
Ø16/20/25/3235/30/20/10
Packing pipe length2.6-4m
Each packaging cycle2.6 meters 43 seconds, 4 meters 52 seconds
Packing pass rateover 99%
Dimensions L × W × H11850x1555x1533mm

PVC Conduit Pipe Making Machine Other terms


1. PVC Conduit Pipe Making Machine Training and services


1) Instruction of field installation

2) Equipment field debugging and trial run if required by the buyer according to the rule.

3) Training on field operation and maintenance for customer's personnel.

4) Provide technical consultation service on long-term basis.

2. PVC Conduit Pipe Making Machine Installation and debugging

When the machine arrives at site, the customer should install it on the appropriate position according to the specifications provided by the supplier; and then the supplier should send its engineers to the site if requirement approved,in order to instruct the customer about trial run and debugging. The customer should provide necessary conditions for trial run and provide materials for trial run, and should decide the processing conditions in trial run with consideration of the supplier's opinions.

1) The price covers the pre-commissioning of the machinery before shipment at Seller's site. The Seller is obliged to test the performance of machinery.

2) The Buyer is obliged to provide suitable space, tools and manpower for the commissioning of the order.
3) This Price does not included commission and installation in buyer’s factory.


3. PVC Conduit Pipe Making Machine Time of delivery

1) When the contract becomes valid, the machine should be delivered within 60 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.

2) During production, provided that the Buyer requests to modify the specification of the order, the Buyer shall notify the Seller of this modification in written form. Upon receipt of the notice, the Seller will quote to the Buyer the cost of this modification and notify the Buyer of any possible delay due to this modification.


4. PVC Conduit Pipe Making Machine Debugging charge

The buyer pays for the plane ticket of round-trip abroad and food and accommodation of buyer’s country during debugging. And the wage of technicians should be paid by the customer (100USD/day).


5. PVC Conduit Pipe Making Machine Guarantee clause
1) Guarantee is 1 year (excluding human factor and wearing parts).
2) Under proper working conditions, 12 months from the date of completion of commissioning at the buyer's site, and should be at the latest within 14 months from the issuing date of Bill of Lading.

China PVC Conduit Pipe Making Machine Four stations output 14tons With Full Automatic Packaging supplier

PVC Conduit Pipe Making Machine Four stations output 14tons With Full Automatic Packaging

Inquiry Cart 0