Home /Plastic Product Making Machinery /

16 - 32mm PVC Four Pipes Extrusion Line For Electrical Conduit Pipe Production

16 - 32mm PVC Four Pipes Extrusion Line For Electrical Conduit Pipe Production

Brand Name:SHENZHEN HYPET
Certification:CE, ISO9001
Model Number:HYPVC-32
Minimum Order Quantity:1 set
Delivery Time:40-60 work days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: Xianke Building Bagua 4th Rd Shenzhen China
Supplier`s last login times: within 31 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

16-32mm Pvc Four Pipes Extrusion Line For Electrical Conduit Pipe Production


Production line composition

Auto loader - Conic twin screw extruder HYZS65/132 - Die head - Vacuum tank - Printer - Haul off unit - Cutter - Stacker


HYPET advantages of 16-32mm PVC Four head conduit line

a. It can be equipped with high-efficiency and high-yield extruder, with large output and low energy consumption, the output can reach 12 tons/day
b. Siemens PLC controls the entire production line, HYPET software, and high configuration
g. Bimetal barrel screw, with a shelf life of 3 years
h. The traction is controlled by a servo motor, and the speed can reach 20m/min


Condition of use

1. Technical features of whole line

SNSpecificationDescriptionRemark
1Suitable materialPVC powder
2Pipe diameter rangeFour pipe Ø16-Ø32mm. (1/2”-1 1/4’)
3Production speed1.2~12 m/min
4Max. output320kg/h
5Test and acceptBased on HYPET standard formula.
6Center height1,000mm
7Whole line size (L x W x H)18,000 x 1,200 x 2,200mm
8Operation directionFrom right to left
9Color of equipmentHYPET white color
10Control of whole productionRefer to the “configuration list”.
NoteExtrusion capacity will be changed according the processing material and working conditions

2. Circumstances condition

SNConditionSpecificationDescription
1

Natural

circumstance

condition

Working placeIndoor use
Power sourceNo dangerous area
Humidity55%~85% no condensation
Temperature0~40 ℃
2

Electricity

source

Installation capacity120 kW
Actual power consumption50 kW
Power supply3P+N+PE
Voltage/Frequency380V/50Hz other can be option
3Cooling waterTemperature≤15 ℃
Water pressure≥0.3MPa
Flow~15 m3/h
4Air conditionCompressor air pressure≥0.6MPa
Flow~0.9 m3/min


Terms & conditions

1. Training and services

1) Instruction of field installation

2) Equipment field debugging and trial run if required by the buyer according to the rule.

3) Training on field operation and maintenance for customer's personnel.

4) Provide technical consultation service on long-term basis.


2. Installation and debugging

When the machine arrives at site, the customer should install it on the appropriate position according to the specifications provided by the supplier; and then the supplier should send its engineers to the site if requirement approved, in order to instruct the customer about trial run and debugging. The customer should provide necessary conditions for trial run and provide materials for trial run, and should decide the processing conditions in trial run with consideration of the supplier's opinions.

1) The price covers the pre-commissioning of the machinery before shipment at Seller's site. The Seller is obliged to test the performance of machinery.

2) The Buyer is obliged to provide suitable space, tools and manpower for the commissioning of the order.

3) This Price does not included commission and installation in buyer’s factory.


3. Pricing

1) The above mentioned quotation is valid within 30 days counted from the issue date of quotation.

2) The price and machinery configuration should be updated and confirmed by the Seller in the case that the quotation has been beyond the validity period.

3) The above mentioned quotation is based on Ex works. Sea transportation and wooden case packing is excluded.

4) The price does not cover the cost of testing material. The testing material will be supplied by the Buyer. Or the Seller will purchase the material as requested by the Buyer at Buyer's cost.

5) The price does not include the cost of commissioning at Buyer's site.

The Seller reserves the right to modify the specification and design of the machine in order to enhance the product quality.


4. Terms of payment

1) T/T and L/C (irrevocable, at sight) both are acceptable.

2) 30% of the total contract value should be paid in advance by T/T, balance 70% of the total value is to be paid before shipping at the Seller’s factory, we accept both T/T and L/C 90 days.


5. Time of delivery

1) When the contract becomes valid, the machine should be delivered within 50 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.

2) During production, provided that the Buyer requests to modify the specification of the order, the Buyer shall notify the Seller of this modification in written form. Upon receipt of the notice, the Seller will quote to the Buyer the cost of this modification and notify the Buyer of any possible delay due to this modification.


6. Debugging charge

The buyer pays for the plane ticket of round-trip abroad and food and accommodation of buyer’s country during debugging. And the wage of technicians should be paid by the customer (80USD/day).


7. Guarantee clause

1) Guarantee is 1 year (excluding human factor and wearing parts).

2) Under proper working conditions, 12 months from the date of completion of commissioning at the buyer's site, and should be at the latest within 14 months from the issuing date of Bill of Lading.

China 16 - 32mm PVC Four Pipes Extrusion Line For Electrical Conduit Pipe Production supplier

16 - 32mm PVC Four Pipes Extrusion Line For Electrical Conduit Pipe Production

Inquiry Cart 0