Add to Cart
PE PP PPR Extruder Machine HYSJ90/28 For Pipe Making
PE PP PPR Extruder Machine Our Feature:
a. Suitable for a variety of different materials and different
functions
b. The aspect ratio is 28:1
PE PP PPR Extruder Machine Technical data:
SN | Parts name | Specification | Description |
1 | Extruder | Extruder model | HYSJ-90/28 single screw |
Max. Output | 150-220kg/h | ||
2 | Screw | Diameter | Ø90mm |
Screw ID ratio | 28:1 | ||
Material | 38CrMoAlA nitrogen quenched | ||
Surface treatment | Polish | ||
Max screw speed | 78 rpm | ||
3 | Barrel | Material | 38CrMoAlA nitrogen quenched |
Inside finish | Nitrogen-filled | ||
Heating power | 11 kW | ||
Cooling system | Low-noisy barrel cooling fan | ||
Cooling power | 0.25kW x 5 sets | ||
4 | Gear box | Housing material | HT200 |
Gear material | 20CrMnTi | ||
Gear type | Helical gear | ||
Gear surface treatment | Quenching | ||
Cooling type | Inside water cooling | ||
5 | Driving motor | AC motor power | 45 kW |
AC inverter controller | ABB |
PE PP PPR Extruder Machine Circumstances condition
SN | Condition | Specification | Description |
1 | Natural circumstance condition | Working place | Indoor use |
Power source | No dangerous area | ||
Humidity | 55%~85% no condensation | ||
Temperature | 0~40 ℃ | ||
2 | Electricity source | Installation capacity | 150 kW |
Actual power consumption | 50 kW | ||
Power supply | 3P+N+PE | ||
Voltage/Frequency | 380V/50Hz other can be option | ||
3 | Cooling water | Temperature | ≤15 ℃ |
Water pressure | ≥0.3MPa | ||
Flow | ~15 m3/h | ||
4 | Air condition | Compressor air pressure | ≥0.6MPa |
Flow | ~0.9 m3/min |
PE PP PPR Extruder Machine Terms & conditions
1. PE PP PPR Extruder Machine Training and services
1) Instruction of field installation
2) Equipment field debugging and trial run if required by the buyer according to the rule.
3) Training on field operation and maintenance for customer's personnel.
4) Provide technical consultation service on long-term basis.
2. PE PP PPR Extruder Machine Installation and debugging
When the machine arrives at site, the customer should install it on the appropriate position according to the specifications provided by the supplier; and then the supplier should send its engineers to the site if requirement approved,in order to instruct the customer about trial run and debugging. The customer should provide necessary conditions for trial run and provide materials for trial run, and should decide the processing conditions in trial run with consideration of the supplier's opinions.
1) The price covers the pre-commissioning of the machinery before shipment at Seller's site. The Seller is obliged to test the performance of machinery.
2) The Buyer is obliged to provide suitable space, tools and manpower for the commissioning of the order.
3) This Price does not included commission and installation in buyer’s factory.
3. PE PP PPR Extruder Machine Terms of payment
1) T/T and L/C (irrevocable, at sight) both are acceptable.
2) 35% of the total contract value should be paid in advance, balance 65% of the total value is to be paid before shipping at the Seller’s factory.
4. PE PP PPR Extruder Machine Time of delivery
1) When the contract becomes valid, the machine should be delivered within 30 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.
2) During production, provided that the Buyer requests to modify the specification of the order, the Buyer shall notify the Seller of this modification in written form. Upon receipt of the notice, the Seller will quote to the Buyer the cost of this modification and notify the Buyer of any possible delay due to this modification.
5. PE PP PPR Extruder Machine Debugging charge
The buyer pays for the plane ticket of round-trip abroad and food and accommodation of buyer’s country during debugging. And the wage of technicians should be paid by the customer (80USD/day).
6. PE PP PPR Extruder Machine Guarantee clause
1) Guarantee is 1 year (excluding human factor and wearing parts).
2) Under proper working conditions, 12 months from the date of completion of commissioning at the buyer's site, and should be at the latest within 14 months from the issuing date of Bill of Lading.