

Add to Cart
1000-3000mp㎥/H Washing Tower For PEB Manufacturing Industry
Details
The washing tower body includes the exhaust gas inlet, outlet,
window, maintenance hole and internal structure for support and
fixation, so as to ensure the corrosion resistance of the equipment
and increase its service life.
The ∮75pp Rasching ring is used as the filling layer of washing
tower. The ∮75pp Rasching ring has the characteristics of large
specific surface area, low pressure loss and low material transfer
height. Compared with other filling materials ∮75pp Rasching ring
has the advantages of higher treatment efficiency and lower
operation cost.
The ∮50pp hollow ball is used as the demisting layer of washing
tower.
The material of circulation sprinker pipe is PP, and the nozzle is
spiral type PP atomizing nozzle. In order to increase the liquid
gas contact surface, a large number of multi-faceted hollow balls
are arranged in the spray layer. This kind of nozzle is not easy to
block, spray angle is large, and the droplet distribution is
uniform, so that the washing tower can play the best treatment
effect.
The circulating water tank is connected with the washing tower
body, with a capacity of 2-3 minutes of circulation water. The
floating ball liquid level controller is set inside the water tank,
and the washing water inlet overflow port and discharge port are
reserved.
Structure and working principle
The industrial waste gas enters the washing tower and is in full
contact with the washing liquid in the tower to generate a
neutralization reaction to achieve the treatment purification
effect, effectively remove dust and other various gases, and
finally meet the discharge requirements.
The equipment features:
1. Low noise, stable operation, simple operation, low cost, etc.
2. In addition to high dust efficiency, it can handle various gases
by using syrup and water.
3. Using high-quality PP sheet, corrosion-resistant, anti-aging,
long service life, and can be customized according to requirements;
Pictures
FAQ
1. Are you a factory?
--- Yes, we are a professional exhaust gas treatment manufacturer
for more than 15 years.
2.How do you check the goods?
--- We inspect all the materials when they arrive, and have sot
inspection during production process. All goods will be tested and
double inspected before delivery, providing 100% guarantee for
clients.
3. How to select the suitable models?
---The parameters above is just for your reference. We need you to
provide us the air flow, solvent composition, working hours,etc for
our team to design the suitable unit for you.
4.How and when can I get the quotation?
--- Send us the inquiry or leave us message. We will get back to
you within 5 minutes during the working time. All messages will be
replied whenever they comes.
5.What's your payment terms?
--- Usually we accept 100%T/T at present. 50% initial payment,down
payment before shipment. Other payment terms can be discussed when
order confirmed.