304SS 2240mm Height Clean Room Equipment 62dB With Induction Door Hepa Filter

Brand Name:anlaitech
Certification:CE , FAT
Model Number:AL-air shower
Minimum Order Quantity:1set of AIR SHOWER
Delivery Time:10WORKING DAYS.
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou China
Address: Plant 106, No. 25, Taian Road, XINQIAO VILLAGE, PANYU DIST. GUANGZHOU CHINA
Supplier`s last login times: within 13 hours
Product Details Company Profile
Product Details

Automatic induction door air showers clean room equipment


Air showers are a tool that allows for people and/or objects to enter a clean area without bringing in unwanted contaminants such as dust and bacteria. Air showers act as a sort of buffer or air lock between two areas of varying cleanliness, and preserve the air quality of a dynamic clean environment. Due to their usefulness and simplicity, air showers are a critical component of modern-day cleanroom facilities.


Air showers employ high-speed currents of air to blow microscopic dust and bacteria particles off of clothing and other surfaces. The air used in air showers runs through a filtration system in order to maintain air purity and avoid recirculation of microscopic contaminants.


Air Shower Standard Features:


Main body construction: heavy gauge steel or 304SS with 304SS floor to minimise particle generation.


Optional powder coating to a range of colours to suit customer specifications.


Double Door model, allows movement of carts and large equipment into cleanroom area.


Emergency Stop button


Power failure safety function Interior fluorescent lighting and flush mounted windows Programmable microprocessor control, touch panel, and timer with LED display


Running & clean mode indicators fitted on front & rear doors


Optional timer, which deactivates interlock system 5 seconds after air shower clean mode has finished.


Optional audio system


Custom sizes are readily available


Automatic sliding door Air Shower Specifications:

ModelAL-AAS1800/P1AL-AAS1800/S2AL-AAS2200/S1

External Size

(W×D×H)mm

1800×1500×22401800×3000×22402200×3000×2240

Internal Work Zone

(W×D×H)mm

800×1300×1960800×2800×1960800×2800×1960
Noise Level(dB)<62<62<62
Stainless Steel Nozzle16PCS24PCS48PCS
Wind Speed≥25m/s≥25m/s≥25m/s
PrefilterWashable type, Aluminum frame, G1-G4
HEPA FilterMini-pleated Type, Aluminum frame, 99.99% 0.3µm
Fluorescent Lamp20W×120W×220W×2
Power Supply380V/50Hz380V/50Hz380V/50Hz
Total Power2.3KW4.7KW4.7KW

Cargo Air Shower Specifications:

ModelAL-GS1800/S1AL-GS2000/S1AL-AS2200/S1

External Size

(W×D×H)mm

1800×1500×21802000×1500×21802200×1500×2180

Internal Work Zone

(W×D×H)mm

1300×1430×19801500×1430×19801700×1430×1980
Noise Level(dB)<62<62<62
Stainless Steel Nozzle16PCS24PCS48PCS
Wind Speed≥25m/s≥25m/s≥25m/s
PrefilterWashable type, Aluminum frame, G1-G4
HEPA FilterMini-pleated Type, Aluminum frame, 99.99% 0.3µm
Fluorescent Lamp20W×120W×220W×2
Power Supply380V/50Hz380V/50Hz380V/50Hz
Total Power2.3KW4.7KW4.7KW

What is the Typical Installation Process?

When shipped fully assembled on its side, the weight for an air shower is approximately 1,300 lb. Two eye bolts located on the top of the air shower can be used to assist in lifting. After standing up the unit, it is then moved into position and leveled using shim stock and is anchored to the floor (anchors to be provided by the installer).

When the unit is shipping knocked-down, the air shower upper blower cabinet is 650 lbs. The wall panels are 250 lbs. The knocked-down air shower needs room on the sides of the unit during the assembly process to install the 3/8" mounting bolts. To assemble the unit, the blower section is taken off the skid and raised into position. The two wall sections are then bolted from the outside onto the upper blower housing. At this point, the assembly is self-supported. The doors are attached, power is connected, and the unit is ready to run. Assembly is fast and uncomplicated. Each unit is shipped with a detailed manual. We do recommend using mechanical lifts to assist in the assembly process. Once the unit is assembled, no space is required on the sides of the unit. After the unit is assembled, moved into place, and the mounting is complete:
An electrician needs to connect power to the air shower, start the unit, and check blower rotation.
China 304SS 2240mm Height Clean Room Equipment 62dB With Induction Door Hepa Filter supplier

304SS 2240mm Height Clean Room Equipment 62dB With Induction Door Hepa Filter

Inquiry Cart 0