Low PUE Containerized Data Center For SME Cloud And Edge

Brand Name:COOLNET
Certification:CE,ROHS,ISO
Model Number:HCDC
Minimum Order Quantity:1 set
Delivery Time:15-20days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Hefei Anhui China
Address: Room 303, 3rd Floor, Building C, Yingte Workshop, West Section of Yanglin Road, High-tech Zone Mechanical and Electrical Industrial Park, Hefei City Anhui Province
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Low PUE Containerized Data Center, Integrated Container Data Center For SME Cloud And Edge


Coolnet I-container series is a prefabricated integrated outdoor data center infrastructure solution that integrates functions such as power supply and distribution, temperature control, cabinets, management, fire protection, lightning protection and grounding. One-stop professional service solves a large number of construction preparation and outsourcing problems for customers, and is the best solution to meet the fast and flexible needs of enterprise-level data centers. Applicable to multiple industries and scenarios, it has minimalist, green, intelligent and safe features.


Container size: standard 20ft/40ft or non-standard custom size.



Applications
Enterprise: Small Data Center
Operator: Small IT room, small IDC, DR room and edge DC
Government: Smart City, Safe City Data Center
Education: University/Institute Data Center


Energy: Production/Investigation Field Data Center

Finance: Backup data center

Transportation: Airport/Railway/Port without housing power supply and distribution



Function

In-row air conditioner : close to the heat source, the cold aisle/hot aisle is closed, which can completely avoid the loss of cooling capacity caused by the mixing of cold and hot air, water cooling.
Scalability:Mobile data center has scalable and modular solutions that allow companies to expand their business as needed in the future.
Redundancy:In the event of a failure, the remaining units will continue to function normally, keeping your business running and protecting your uptime.
Customer value
IDC dynamic environment monitoring system: comprehensive visualization of 3D computer room on-site management, intelligent monitoring and fault alarm, real-time monitoring of fire protection, access control, power and other equipment, reducing workload and improving maintenance efficiency.
Customization: The standard container production process is used for welding and anti-corrosion, and it can be processed and produced according to different specifications to meet the customization needs of different projects.
Flexible deployment: It takes 18-24 months to complete the traditional data center, our new generation prefaricated data center can reduce the time to 2-3 months, just plug in power supply and it can be used.
PRODUCT PARAMETERSICDC-20ICDC-20
Container Size20’HQ40’HQ
Rack Specification600*1000(1100)*2000mm600*1000(1100)*2000mm
Single Rack Capacity42U42U
Rack Quantity4PCS8-10PCS
Single Rack Capacity3-10KW3-10KW
IT Equipment Total Capacity12-30kw24-75KW
UPS25kva*2 N+1 modular UPS25kva*4 N+1 modular UPS
Battery back up time5-15mins5-20mins
CoolingIn-row air conditionerIn-row air conditioner
Monitoring systemYESYES
Door Security SystemYESYES
Fire alarm and gas fire extinguishing systemYESYES
Video Monitoring SystemYESYES
EPOYESYES
TransportabilitySupportSupport
StackableSupportSupport
ApplicationOutdoor TypeOutdoor Type
Diesel Generator ModuleExtrapositionExtraposition
China Low PUE Containerized Data Center For SME Cloud And Edge supplier

Low PUE Containerized Data Center For SME Cloud And Edge

Inquiry Cart 0