250m/Min Tape Extrusion Stretching Production Line Hard Wire 110kw

Brand Name:United Win
Model Number:SJPL-Z90x33-1100/900
Minimum Order Quantity:1 set
Payment Terms:L/C, T/T
Place of Origin:CHINA
Price:USD
Contact Now

Add to Cart

Verified Supplier
Location: Changzhou Jiangsu China
Address: 16A-103, Jintong International Industrial Park, Wujin National High-tech Zone, Changzhou City, Jiangsu Province, China
Supplier`s last login times: within 34 hours
Product Details Company Profile
Product Details

250m/Min Tape Extrusion Stretching Production Line Hard Wire Extrusion


Descripition:

This series flat yarn extrusion line is designed and developed on the base of introducing and assimilating the up-to-date technologies at home and abroad.

It adopts the international electric digital-simulation control technology such as computer-controlled frequency conversion speed regulation so as to make the main target reach the international advanced level.
Meanwhile, with high production efficiency and high quality of tape tube forming.

As required, this assembly can also be equipped with advanced filter change structure as well as fibrosis structure that is used for producing flexible packaging bags or fibrosis sewing thread.



Technical Parameters:

ItemParameter
Fibre range60-2000Tex
Design speed250m/min
max. capacity4500kg/24hr
Stretching ratio4-10
Installing power4-10
Working power110KW
Size~38000×4800×2500mm
Total weight25T



Machine Photos:


FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)


2. How many days will you finish installing?
We will finish installation and training within 15 days.


3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.


4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.

5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date


6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.


7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.


China 250m/Min Tape Extrusion Stretching Production Line Hard Wire 110kw supplier

250m/Min Tape Extrusion Stretching Production Line Hard Wire 110kw

Inquiry Cart 0