GPS NPA-805H 8 Wing Powerline Drone For Transmission Line Construction

Brand Name:BOYU
Certification:ISO9001 CE FCC
Model Number:NPA-805H
Minimum Order Quantity:1set
Delivery Time:20 days
Payment Terms:L/C, T/T, D/P, D/A
Contact Now

Add to Cart

Verified Supplier
Address: Yipeng Industrial Part, 2 Xingli Road, Yixing, Jiangsu, 214200, China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

NPA-805H 8-wing Powerline Drone For Transmission Line Construction With GPS


NPA-805H
Axle distance/Height1080mm/450mmCameraSingle Axis Gimbal 720P
Fail-SafewithGPSwith
Maximum tension8kgNo-load endurance25-30min
Maximum take-off weight14kgLoad endurance12-18min
Flying speed0~15m/minFlight modeManual control; ATT; GPS
Empty weight4kgBattery16000mAh 6S
Maximum flight distance2-4kmFlight height0-1000m (adjustable)
Working Temperature-5℃---50℃Diameter of traction rope2-4mm
Functions: GPS positioning, full-auto return, semi-auto return, runaway protection, headless mode, heading lock, low-voltage protection alarm, battery power backhaul, national exclusive high beam function, OSD flight data real-time backhaul, etc.
1Drone with DJI flight control system1 set
2Dual channel charger1 set
3Professional remote control1 set
416000mah high quality battery3 pcs
56.5” screen mobile phone1 pcs
6Battery voltage capacity checker1 set
7Tool kits1 set
8Aviation aluminum box1 pcs
9Spare screws1 pack
10Backup battery strap4 pcs
11Spare propeller8 pcs


Application

The trees in the virgin forests often encounter bushes, virgin forests, etc. during the construction of the national grid.

This will definitely affect the progress of the construction.

When passing through the virgin forest, the trees cannot be felled.

This undoubtedly adds a lot of difficulty to the construction of the project, and with the lined drone, it is easy to fly over the trees and cast a guide rope to the ground.


In the traditional wire-laying operation on the Yangtze River, the tow rope can only be towed by the tugboat over the water surface.

The construction water surface must be sealed first.

The closure of the navigation will also cause many economic losses to the country and the construction party.

The personnel stood on the ship and remotely dragged the helicopter of the guide rope so that the guide rope could fly over the Yangtze River and avoid sealing.

In the construction will also encounter swamps, lakes, farmland, highways, mountains, etc., when people are unable to achieve the construction of the line, the line of drones also show their talents, complete the task.


The situation of charging across the power usually exists in the process of circuit reconstruction.

It is necessary to straddle a new line on the basis of a power-on line.

In order to ensure the safety of construction workers, traditional construction can only be used first. After the line is powered off and then constructed, the overhead drone can be used to avoid power outages.

China GPS NPA-805H 8 Wing Powerline Drone For Transmission Line Construction supplier

GPS NPA-805H 8 Wing Powerline Drone For Transmission Line Construction

Inquiry Cart 0