Add to Cart
CX-JY02 Automatic Stator Six-Station Inner Winding Machine
The main performance parameters of the equipment:
1. The scope of equipment applicable products: fan motors, air
conditioner motors, range hood motors, servo motors, stepper motors
and various
DC brushless motor, etc.
Equipment parameters and product accuracy that can be met:
Six-station model: the machine can control and process the winding
process while winding at high speed, and can perform four-axis
synchronous and neatly arranged winding, and can achieve special
processes with high winding requirements; the machine adopts servo
precision Positioning, automatic thread winding, thread tail,
automatic winding, automatic cable arrangement, automatic indexing,
automatic clamping and cutting, realize the optimal cost
performance of the equipment.
Applicable wire diameter of the machine: ¢0.1-0.6 "Need to replace
the tensioner"
Stator outer diameter: ¢20-100mm
Stator inner diameter:¢10-80mm
Stator thickness:¢4-85mm
Equipment speed: 600-1000 rpm "according to the stator height wire
diameter"
3. Equipment size: 1100*1500*1600mm
2. Brand requirements for main components of the equipment
Equipment main components and Brand
Part Name | Brand Model / Specification | Origin Country | Remark |
Cylinder Air | TAC | Taiwan | |
Control System | Leisai | Shenzhen China | |
Touch Screen | Weilun | Taiwan | |
Motor | Keiyo | China | Custom |
Rack | Aluminum Profile Rack | China | |
Lead Screw | SHAR | Taiwan | |
Guide rail | Shangyin | Taiwan | |
Spare Parts | Keiyo | China |
The equipment is suitable for grid power supply/working environment
Power supply standard: in line with China's power supply standard
power supply 380V ± 10%
Air source pressure: 0.4-0.75Mpa
Remarks: The electrical box (electrical control box) of the machine
should be equipped with a leakage protection switch and safety
measures. The equipment circuit is manufactured according to the
equipment standardization, and the wiring diagram is attached for
maintenance.
Ambient temperature: - 5°C---40°C
Equipment schematic diagram
Information
1) The equipment is accompanied by a detailed equipment instruction
manual.
2) The following information should be attached to the equipment
manual:
a. Equipment operation manual
b. Equipment daily maintenance manual electrical and mechanical
systems
c. A list of wearing parts, which should include: the name, brand,
model specification, quantity used, etc. of components, as well as
the processing drawings and purchase of wearing parts.
Equipment commissioning, acceptance and training
1. After the equipment arrives at the factory, Party B assists
Party A in installation and commissioning, and Party B shall bear
the expenses during the installation and commissioning process by
itself;
2. After the equipment debugging is completed, the performance and
requirements of the equipment shall be checked and accepted by both
parties in accordance with the technical agreement;
3. Equipment acceptance shall be checked and accepted at Party A's
factory, and the product samples provided by Party A shall be used
for trial production to meet Party A's process quality and use
requirements;
4. Party B's company will assign operators to Party A's company for
personnel operation training (the training period is up to 2 days).
Seven, equipment after-sales service
1. After the equipment commissioning is completed, the engineers of
Party B shall conduct equipment operation and maintenance training
for the technical and operating personnel of Party A;
2. After being notified of the failure of Party A's equipment,
Party A shall provide an oral or written solution within 2 hours to
guide Party A's engineering personnel to solve the failure. If the
failure cannot be eliminated, Party B's engineer shall go to Party
A's company for equipment repair. For maintenance, Party B needs to
try to solve the problem in the shortest time (the time shall not
exceed 48H, except holidays), so as to reduce the loss of Party A.